Laserfiche WebLink
EXHIBIT A-2 <br /> SCOPE OF WORK <br /> TASK 08—DESIGN REPORT <br /> URS will prepare a design report summarizing the investigations, design criteria, assumptions, <br /> analytical results and recommendations. The report will consist of the following elements: <br /> • Section 1.0— Introduction <br /> o Project History <br /> o Scope of Work <br /> • Section 2.0—Project Description <br /> o Existing Conditions <br /> o Planned Construction <br /> • Section 3.0— Survey <br /> • Section 4.0—Wetland Delineation <br /> o Introduction <br /> o Results <br /> • Section 5.0—Geotechnical Evaluation <br /> o Introduction <br /> o Near Surface Soil Units <br /> o Geotechnical Data <br /> o Geotechnical Interpretation <br /> • Section 6.0— Hydraulic Analysis <br /> o Introduction <br /> o Hydrologic Analysis <br /> o Hydraulic Analyses <br /> o Estimation of Scour Depth <br /> o Geomorphology and Streambank Stability <br /> • Section 7.0— Pipeline Design <br /> o Introduction <br /> o Design Criteria <br /> o Pressure <br /> o Coatings <br /> o Connections and Appurtenances <br /> o Dechlorination <br /> • Section 8.0—Water Quality Monitoring and Temporary Erosion/Sediment Control <br /> • Appendix including reduced-size Construction Plan Drawings (Task 09) <br /> • Appendix of Calculations (Task 07) <br /> The design report will be included with the 60%, 95% and 100% design submittals. One bound <br /> and one unbound camera-ready copy of the report will be submitted at each phase of the design. <br /> TASK 09— CONSTRUCTION PLAN DRAWINGS <br /> URS will prepare full size 24-inch by 36-inch CADD construction plan drawings for the design. <br /> The drawings will be produced in AutoCAD 2004 and will be prepared in accordance with the <br /> City Engineering Services Department drafting standards, title block layout and other <br /> requirements. URS anticipates the following sheets: <br /> Page 6 of W <br />