My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4457
>
Resolutions
>
Resolution 4457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 12:09:01 PM
Creation date
3/30/2017 12:08:41 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
4457
Date
7/2/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM. 1998 TO 2003 <br /> Agency: City of Everett <br /> City No.: 0420 Nearing Date _ Pg 5 <br /> County NO.: 31 Adoption Date <br /> MPO: PSRC COLLECTOR ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION ISTU PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t 0 L 0 FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A. FEDERAL AID ROUTE NO. p a talc FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B. BRIDGE NO. r T t anlo PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T 1 r C. PROJECT TITLE o y u 1 5 1 d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th. ENVIR. R/W <br /> Na 1 N D. STREET/COUNTY ROAD NAME OR NUMBER v p • t t• PHASE By Code TSA lot 2nd 3rd 5th, TYPE REQ. <br /> L• t o B. TERMINAL BEGINNING AND END . • h y I STARTS Phase UATA 6th Y/N <br /> • V . F. DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 17 1 A. 2754 05 1 C PE 8/2000• EIS: <br /> B. N/A 06 P P 0/0 5/2001• TIA 12000 3000 15000 750 14250 CE: <br /> C. 76TH STREET P/R MAT AND ACCESS IMPROVEMENTS 12 O CONST 3/2002• OTHER EA: DATE: <br /> D. 36TH STREET, BROADWAY. 41ST STREET 21 T TOTAL N/A: <br /> E. SMITH STREET TO I-5 <br /> F. DESIGN AND CONSTRUCT P/R LOT, ACCESS INPROV. <br /> 17 2 A. 2786 04 0.8 C PE 10/96 EIS: <br /> B. N/A 06 P P R/W 11/97 CE: <br /> C. 75TH STREET IMPROVEMENTS 12 O CONST 6/98 EA: DATE: <br /> D. 75TH STREET T TOTAL OTHER 1034 266 1300 1100 N/A: <br /> E. BEVERLY LANE TO BEVERLY BLVD. <br /> F. DESIGN AND CONSTRUCT ROAD WIDENING, IMPROVEMENTS <br /> 17 3 A. VARIOUS 31 0.9 C PB 4/99' EIS: <br /> B. N/A P P R/W CE: <br /> C. COLLECTOR ARTERIAL NEEDS STUDY O CONST EA: DATE, <br /> D. VARIOUS LOCATIONS 2 TOTAL 50 50 50 N/A: <br /> 8. VARIOUS LOCATIONS <br /> P. STUDY ULTIMATE COLLECTOR ARTERIAL IMPROVEMENTS <br /> 17 6 A. 2795 01 0.3 C PE 1/2000• EIS: <br /> B. N/A 08 P P R/W 6/2000• CE: <br /> C. RIVERSIDE INDUSTRIAL PARK ACCESS BRIDGE O CONST 7/2001' EA: DATE: <br /> D. VICINITY OF I-S AND E. MARINE VIEW DRIVE T TOTAL OTHER 1000 4400 5400 600 5000 N/A, <br /> B. EAST MARINE VIEW DRIVE TO SNOHOMISH RIVERFRONT <br /> F. DESIGN AND CONSTRUCT BRIDGE ACCESS TO RIVERFRONT <br /> •A portion or ell of the funding for these project•has not yet been committed. <br /> NOTE: •Local Fund.' include City of Everett. Snohomish County, and/or Port of Everett funds contributed or tentatively contributed to the projects. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.