Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM, 1998 TO 2003 <br /> Agency: City of Everett <br /> City No.: 0420 Hearing Date Pg 4 <br /> County No.: 31 Adoption Date _ <br /> MPO: PSRC MINOR ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION ISTU PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U a [ o L C FUNDING SOURCE INFORMATION FEDERALLY <br /> N 1 A. FEDERAL AID ROUTE NO. p a t e 1 C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B. BRIDGE NO. r T [ anlo PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T 1 r C. PROTECT TITLE o y u 1 g 1 d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> Ma I N D. STREET/COUNTY ROAD NAME OR NURSER v p s C C e PHASE By Code TIA let 2nd 3rd 5th. TYPE REQ. <br /> Ls t o E. TERMINAL BEGINNING AND END . e h y e STARTS Phase DATA 6th Y/N <br /> y . F. DESCRIBE WORK TO BE DONE OTHER DATE , <br /> 1 2 3 • <br /> 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 16 1 A. 2765 01 2.5 C PE 2/99• _ EIS: <br /> B. N/A 08 P P R/W 1/2000• 16000 1500 2500 12000 CE: <br /> C. 38TH STREET RAILWAY OVERCROSSINO AND RIVERFRONT PARKWAY 06 0 CONST 4/2001• EA: DATE: <br /> D. 38TH STREET T TOTAL N/A: <br /> E. 41ST STREET INTERCONNECT TO LOWELL-SNOHOMISH RIVER ROAD 0 <br /> F. DESIGN AND CONSTRUCT RAILWAY OVERCROSSING, NEW ARTERIAL _ W <br /> 16 2 A. 2588 04 3.5 C PE 2/93• EIS: <br /> B. N/A 06 F P R/W 1/97• TIA 13800 2200 16000 4000 10000 1500 CE: <br /> C. 112TH STREET IMPROVEMENTS 12 G O CONST 4/98• EA: ,DATE: <br /> D. 112TH STREET S T TOTAL N/A: <br /> E. SR 527 TO SR 525 <br /> F. DESIGN AND CONSTRUCT ROAD WIDENING, IMPROVEMENTS <br /> 16 3 A. 2575 04 1 C PE 4/94 288 EIS: <br /> B. N/A 06 F P R/W 9/96 TIA 145 2612 3533 2000 CE: YES <br /> C. 100TH STREET SE IMPROVEMENTS 12 0 CONST 6/98 488 EA: X DATE: <br /> D. 100TH STREET SE T TOTAL 776 N/A: ,9/96 <br /> E. 19TH AVENUE SE TO 35TH AVENUE SE <br /> F. DESIGN AND CONSTRUCT ROAD WIDENING, IMPROVEMENTS _ <br /> 16 4 A. 2597 05 0.5 C PE 7/96 EIS: <br /> B. N/A 06 P P R/W 12/97 TIA 300 2050 2350 2000 50 CE: <br /> C. 4TH AVENUE WEST IMPROVEMENTS 12 O CONST 8/98 EA: DATE: <br /> D. 4TH AVENUE WEST T TOTAL N/A: <br /> E. HOLLY DRIVE TO 88TH STREET S. W. <br /> F. DESIGN AND CONSTRUCT ROAD WIDENING, IMPROVEMENT <br /> 16 5 A. 2781 05 2 C PE 2/2000• EIS: <br /> B. N/A 06 P P R/W 9/2000• 2000 350 1650 CE: <br /> C. SEAWAY BLVD. IMPROVEMENTS 12 0 CONST 5/2001• EA: ,DATE: <br /> D. SEAWAY BLVD. T TOTAL N/A: <br /> E. 75TH STREET TO 36TH STREET <br /> F. DESIGN AND CONSTRUCT ROAD WIDENING, IMPROVEMENTS <br /> 16 6 A. 2584 "04 1 C PE 2/2001• EIS: <br /> B. N/A 06 P P R/W 200 5000 200 CE: <br /> C. 100TH STREET SM IMPROVEMENTS 12 0 CONST ER: DATE:N/ <br /> D. 100TH STREET SW �i T TOTAL A: <br /> E. AIRPORT ROAD TO EVERGREEN WAY <br /> F. DESIGN AND CONSTRUCT ROAD WIDENING. IMPROVEMENTS <br /> •A portion or all of the funding for these projects hes not yet been committed. <br /> NOM 'Local Funds Include City of Everett, Snohomish County, and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />