My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4457
>
Resolutions
>
Resolution 4457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 12:09:01 PM
Creation date
3/30/2017 12:08:41 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
4457
Date
7/2/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM. 1998 TO 2003 <br /> Agency: City Of Everett <br /> City No.: 0420 Hearing Date Pg 3 <br /> County No., 31 Adoption Date <br /> MPO, PSRC PRINCIPAL ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N 1 A. FEDERAL AID ROUTE NO. p a t e 1 C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B. BRIDGE NO. r T t a n 1 o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Assoc ) PROJECTS <br /> T 1 r C. PROJECT TITLE o y u 1 g 1 d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> Ne 1 N D. STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th. TYPE REQ. <br /> L• t o E. TERMINAL BEGINNING AND END . e h y s STARTS Phase DATA 6th YIN <br /> • y . F. DESCRIBE WORK TO BE DONE OTHER DATE <br /> 12 3 4 5 6 .. 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 10 A. 0529 01 0.15 C PE 3/2000• _ EIS: <br /> B. N/A 06 P P R/W TIA 6000 300 5700 CE: <br /> C. EVERETT AVENUE IMPROVEMENTS 00 T CONST 5/2002• _ EA: DATE: <br /> D. EVERETT AVENUE; SR 529 O TOTAL N/A: <br /> E. NORTON AVENUE TO WATERFRONT <br /> F. DESIGN AND CONSTRUCT ARTERIAL EXTENSION TO WATERFRONT <br /> 14 11 A. 2797 05 1.2 C PE 3/2000• EIS: <br /> B. N/A 06 P P R/W UATA 3000 200 2800 CE: <br /> C. EAST MARINE VIEW DRIVE IMPROVEMENTS 12 T CONST 5/2001• EA: DATE: <br /> D. EAST MARINE VIEW DRIVE; FAS NO. 2797 0 TOTAL N/A: <br /> E. NORTH BROADWAY TO I-5 <br /> F. DESIGN AND CONSTRUCT ROADWAY WIDENING AND IMPROVEMENTS <br /> 14 12 A. 2777 31 00 00 PE 2/2000• _ EIS: <br /> B. N/A P R/W CE: <br /> C. SOUTH BROADWAY PREDESIGN STUDY AND ENVIRONMENTAL REVIEW CONST EA: DATE: <br /> D. SOUTH BROADWAY. FAS NO. 2777 TOTAL OTHER 500 125 625 625 N/A: <br /> E. 41ST STREET TO BEVERLY BLVD. <br /> F. PRELIMINARY URBAN DESIGN STUDY AND ENVIRONMENTAL REVIEW <br /> 14 13 A. 2776 31 00 00 PE 2/2000• _ EIS: <br /> B. N/A P R/W CE: <br /> C. MUKILTED BLVD./41ST STREET CORRIDOR AND PEDESTRIAN STUDY CONST EA: DATE: <br /> D. MUEILTEO BLVD., FAS NO. 2776 TOTAL OTHER 100 100 100 N/A: <br /> E. BROADWAY TO DOGWOOD/OLYMPIC <br /> F. PRELIMINARY URBAN DESIGN STUDY AND ENVIRONMENTAL REVIEW <br /> 14 14 A. VARIOUS 31 00 00 PE 5/99• EIS: <br /> B. N/A P R/W 250 250 75 75 100 CE: <br /> C. ARTERIAL NEEDS STUDY CONST EA: DATE: <br /> D. SEAWAY BLVD.. BROADWAY. 112TH ST.. PACIFIC ST. R/R CROSS.. ETC. TOTAL N/A: <br /> E. VARIOUS SECTIONS <br /> F. STUDY IMPROVEMENT NEEDS <br /> 14 15 A. 2586 04 2.25 C PE 10/94 EIS: Yes <br /> B. N/A 06 F P R/W 1/95 500 CMAQ TIA 3250 1450 4700 500 3850 100 CE: <br /> C. AIRPORT ROAD NOV LANES 12 T CONST 3/98 EA: X DATE: <br /> D. AIRPORT ROAD 0 TOTAL 500 N/A: 1/95 <br /> E. CASINO ROAD TO SR 99 <br /> F. COMPLETE ARTERIAL NOV LANE PROJECT <br /> 14 16 A. 0525 01 5 C PE 12/91 1027 STP (U) EIS: X Yes <br /> B. N/A 05 F P R/W 9/95• 1000 STP (U) TIA 27487 11600 89000 5000 13000 27000 40000 CE: <br /> C. PAINE FIELD BLVD./SR 525 CORRIDOR PROJECTS 06 5 0 CONST 10/96• 2500 STP (U) OTHER EA: DATE: <br /> D. PAINE FIELD BLVD.; SR 525 12 S T TOTAL 4527 N/A: 9/95 <br /> E. SR 525, BETWEEN SR 526 AND I-5 <br /> P. NEW ALIGTBIDIT; ROADWAY IMPROVEMENTS, NEW INTERCHANGE <br /> 14 17 A. 0096 04 0.6 C PE 3/95 EIS: <br /> B. N/A 06 F P R/W 4/97• TIA 2700 300 3000 800 1900 CE: <br /> C. SR 96 NOV LANES 12 T CONST 6/98• EA: DATE: <br /> D. 128TH STREET SE; SR 96 0 TOTAL N/A: <br /> E. I-5 TO DUMAS ROAD <br /> F. DESIGN AND CONSTRUCT ARTERIAL NOV LANES <br /> 14 18 A. 0526. 2781 31 00 00 PE 6/2000• EIS: <br /> B. N/A P R/W TIA 800 200 1000 1000 CE: <br /> C. PAINE FIELD BLVD. EXTENSION ENVIRON. L DESIGN STUDIES CONST EA: DATE: <br /> D. PAINE FIELD BLVD. TOTAL N/A: <br /> E. SR 526 TO MUXILTEO WATERFRONT . <br /> F. ENVIRON. i DESIGN STUDIES OF JAPANESE GULCH ARTERIAL (CITY OF MUKILTEO) <br /> •A portion or all of the funding for these project phases has not yet been committed. <br /> NOTE: 'Local Funds. include City of Everett, Snohomish County, and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.