My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3809 MCDOUGALL AVE 2018-01-02 MF Import
>
Address Records
>
MCDOUGALL AVE
>
3809
>
3809 MCDOUGALL AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:48:50 PM
Creation date
3/31/2017 10:24:06 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3809
Notes
(NEW ADDRESS, CHANGED FROM 2202 38th St)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' �\ <br /> � <br /> 25. When access to or wi[hin a structure or an area is unduly difficult because of secured openings <br /> or where immediate access is necessary for life saving or 6te-fighting purposes, d�e I'ii <br /> Department may recommend or require a key box to be installed in an accessible location. A <br /> rapid entry system may nlso be desirable in order to avoid unnecessary damage while making <br /> entry to any bui!ding during an emergency situation. <br /> Please call 257-8123 for further information. <br /> 26. Demoli[ion of buildings shall be in compliar.ce with the provisions of the Uniform Pir. .�ode, <br /> Section 8706 Firesafery during Demolition. <br /> 27. tligh-Piled Storzr„� - Buildings containing high-piled combustible storage shall be in <br /> accordance with Arti�:le 81 of the Uniform Fire Code and Articles Rl-I and 81^ of the 1994 <br /> Uniform Fire Cade ;tandards. A Fire Department permit is required for high-piled storage. <br /> 28. Trash Collection - Dumpsters over LS cubic yards capacity shall be located a minimum of 5 <br /> fee[ from the building (UFC 1103.2.2, 1994 Editiou). <br /> 51. The Washington State Clean Air Act requires the use of all known, available, and reasonable <br /> means of controlling air pollution, including dust. Dust generated during construction activities <br /> can be controlled by wettinF, those dust sources such as areas of exposed soils, washing truck <br /> wheels before they leave the site, and instafling and main[ainir.g gravel construction entrances. <br /> Construction vehicle track-out is also a major dust source. Any evidence of track-out can <br /> trigger violations and fines from the Department of Ecology or the Puget Sound Air Pollution <br /> Control Agency. <br /> G�NERAL INFORMATION <br /> 1. The Snohomish County PUD currently has sufficient capacity to provide electrical pocver to � <br /> this proposed development. For further information about the electrical service requirements <br /> for this project, please call the Distric['s Everett Office at 425-258-8272 ro contact a Customer <br /> Engineer. y� <br /> 1 <br /> � <br /> i <br /> c, <br />
The URL can be used to link to this page
Your browser does not support the video tag.