Laserfiche WebLink
� <br /> JTE, Inc. <br /> Mike Collins, Division General Manager <br /> PACIFIC NORTHWEST RURAL/METRO AMBULANCE <br /> December 9. 2009 <br /> Page 3- <br /> Captured Trips: Site trips shared by more than one land use in a multi-use <br /> development. <br /> Primary �New)Trips: Trips made for the specific purpose of using the services of <br /> the project. <br /> Trip Generation <br /> The project site is currently developed witli a 47,842 sf building. A portion of the building <br /> (20.560 sf) is to be converted into the pro�osed pro�ect. And an additional 5,283 sf is to be <br /> added via ser,ond floor addition to be used for office by lhe proposed project. <br /> We have conducted the trip generation using the foilowing variables: <br /> • Existing Use <br /> o General Light Induslrial <br /> • Proposed Use <br /> o Office <br /> • Squarc Footagc <br /> • Number of Eciployees <br /> o Maintenance/Ambulance Usage <br /> • Derived using provided data lincluded in the apper�dix) <br /> The proposed Rural Ambulance project is expected to generate [he vehicular trips during Ihe <br /> average weekday,street traffic AM and PM peak hours as shown in Tat le 1. The trip <br /> generation for[he project is calculatcd using Irip rales from the Institute of Transportation <br /> Engineers (ITE)Trip Generation, Eighth Edition, for Manufacturing and Genaral Light <br /> Industrial QTE Land Use Codr, 140 and 110, respectively). A�I site trips made by ail vehicles <br /> (or all purposes, including commuter, visitor, and service and deiivery vchicle trips are <br /> included in lhe lrip generation values. <br /> Existing Use: <br /> As indicaled earlier in this report the project site is developed with a 47,842 sf building that <br /> was classified as General Light Industrial. The proposed project is to convert 20,560 5(of <br /> the existing building. Thus for analysis purposes we have used 20,560 sf as the basis for the <br /> existing use. Based on our analysis the exis[ing use is projecteJ to generate 20 PM peak <br /> hour trips. <br /> Proposed L'se: <br /> The proposed project provides lwo different components: <br /> � Of(ice <br /> � Arnbulance Operations/Maintenance <br /> ,� . ��� <br /> � <br />