Laserfiche WebLink
Address or Site ID: <br />1997 jN. SEC I estd 0H9 Clie� <br />PHASE <br />Q Q 16. Exterior slab on grade insulation, shall be R-10 (Prescriptive Options) OR <br />O O R- for calculated options. <br />Q Q 17. Exterior below grade wall insulation shall be R-10 (Prescriptive Options) OR <br />Q Q R- for calculated options. <br />Q Q 18. Exterior slab or wall insulation shall be approved for below -grade use. <br />Q Q 19. Walls, including rim joists, shall be insulated without compression according to selected <br />Prescriptive Option or calculations to R- <br />O O 20. Interior below grade walls shall be insulated without compression to R- <br />Q Q 21. Skylight walls shall be insulated without compression to the wall R-value. <br />O O 22. Vaulted ceilings shall be insulated without compression to R- <br />Q Q 23. Vapor retarders shall be installed toward the warm surface as represented below (502.1.6): <br />Select one option for floors, walls, and appropriate ceilings: <br />Floors O Plywood w/exterior glue O Poly (2 4 Mil) O Backed batts <br />Walls O Poly plastic ((2 4 Mil) O Face -stapled, backed baits O Low -perm paint <br />Ceilings O Not required where ventilation space averages 212" above insulation. <br />O Face -stapled backed batts O Poly plastic 2 4 MilO Low -perm paint <br />Q Q 24. Heating system efficiency and sizing requirements shall be met as represented below (S.503): <br />Q Q 25. Heat pump efficiency, as listed in the ARI directory, shall be met as follows: <br />O Split system, air source heat pump: HSPF 2 6 8, COP 2 3.0 <br />O Single package, air source heap pump: HSPF z 6.6, COP 2 3.0 <br />O Water source heat pump: COP 2 3.8. <br />O Ground source heat pump: COP 2 3.0 <br />Q Q 26. Central combustion heating system AFUE rating, as listed in the GAMA Directory, shall be: <br />O z .78 (Med. Prescriptive Options & Chap 5 Calculation) O 2.88 (High Efficiency Options) <br />O 2.74 ow Efficiency lions O Other as per Systems Analysis Qualification <br />Q Q 27. Non -central combustion heating systems shall have intermittent ignition. <br />Q Q 28. Maximum heating system output (150% of design heat load) is KW or BTU/hr. <br />Q Q 29. High efficiency forced -air furnace (5 56,000 BTU/hr output) may exceed the Design Heat Load <br />(DHL). GAMA listed AFUE is 278 + 1 per each 5000 BTU/hr output that it exceeds the DHL. <br />Heating system requirements will be met with the following system (S.503.4.1.1): <br />MaBM# <br />Max. output KW orr BTU/hr. <br />BT U/hr. <br />Tvne ucnc <br />WSEC Insulation Phase Requirements: <br />