My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE B: SM: I ISLAND LANDFILL 177065B <br />PHASE 2 CLOSURE IMPROVEMENTS <br />SECTION 02316 <br />FILL AND BACKTILL <br />PART1 GENERAL <br />1.1 WORK INCLUDED <br />A. This section describes placement and testing of fill and backfill for waste <br />regrading and soil cover placement for Phase 2 Closure Improvements. <br />1.2 DEFINITIONS <br />A. Borrow Material: Material from required excavations on or near jite. <br />B. Completed Course: A course or layer that is ready for next layer or next phase <br />of Work. <br />C. Embankment Material: Fill materials required to raise existing grade in areas <br />other than under structures. <br />D. Geosynthetics: Geotextiles. <br />E. Imported Material: Materials obtained from sources offsite, suitable for <br />specified use. <br />F. Lift: Loose (uncompacted) layer of material. <br />G. Optimum Moisture Content: <br />1. Determined in accordance with ASTM Standard specified to determine <br />maximum dry density for relative compaction. <br />2. Determine field moisture content on basis of fraction passing 3/4-inch <br />sieve. <br />H. Prepared Ground Surface: Ground surface after completion of required <br />demolition, clearing and 3rubbing, scalping of sod, stripping of topsoil, <br />excavation to grade, and subgrade prenaration. <br />Relative Compaction: <br />1. Ratio, in percent, of as -compacted field dry density to laboratory <br />maximum dry density as determined in accordance with ASTM D698. <br />2. Apply corrections for oversize material to either as -compacted field dry <br />density or maximum dry density, as determined by Engineer. <br />SEA/177065.A7.19 JULY 16, 2004 <br />02316 1 FILL. AND BACKFII.L <br />
The URL can be used to link to this page
Your browser does not support the video tag.