Laserfiche WebLink
Novaek Property 99-11-10 <br />510 Place <br />Everett, Wa. <br />If grading must be initiated within areas of the site where soils are more than about <br />2 percent wetter than optimum, those areas to receive fill should be blanketed with a <br />clean, coarse free draining crushed rock, quarry spalls or equivalent non -moisture <br />sensitive material to provide a working surface for the subsequent structural fill <br />placement. No fill materials shall be placed over or near the ravine slopes located <br />within the western portion of the site. <br />4.3 Structural Fill <br />All fill placed within the proposed driveway prism, within areas to be graded or that <br />will receive Ell, should consist of a granular, free draining borrow material and <br />should be placed in accordance with the following recommendations for structural <br />fill. Prior to placement of structural fill, the surface to receive fill should be <br />prepared as previously recommended by removing topsoil and fill material, pre - <br />rolling and compaction. Structural fill should be placed in loose lifts not exceeding <br />8 inches in thickness. Individual lifts should be mechanically compacted to a <br />uniform density of at least 95 percent of the modified Proctor dry density (ASTM D- <br />1557). All fill placed on the site slopes should be properly keyed and benched into <br />firm materials in accordance with section 2-03.3(14), "Embankment <br />Construction", of the WSDOT Standard Specifications. <br />10 GES, Inc. <br />