My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5114 33RD AVE W 2018-01-02 MF Import
>
Address Records
>
33RD AVE W
>
5114
>
5114 33RD AVE W 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 3:08:35 PM
Creation date
4/1/2017 3:11:35 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD AVE W
Street Number
5114
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Novack Property <br />510 Place <br />Evereft, Wa. <br />99-11-10 <br />backfill should consist only of free draining granular material. If the backfilled walls <br />are structurally restrained from lateral movement at the top, we recommend that the <br />walls be designed for an equivalent weight of 50 pounds per cubic foot (pcf) to <br />represent at rest pressure. If the tops of the walls are free to move laterally by an <br />amount equal to at least 0.1 percent of the wall height, they may be designed for <br />active conditions using an equivalent fluid pressure of 35 pcf. Surcharges due to <br />sloping ground, adjacent footings, vehicles, construction equipment, etc., must be <br />added to these values. Only light hand-held vibratory equipment should be used to <br />compact soil within 5 feet of all walls and foundations. <br />For modeling under seismic conditions, we recommend that a dynamic rectangular <br />pressure increment be added to the static equivalent fluid pressure as stated <br />previously in this report. <br />4.8 Run-off, Drainase and Erosion Control Considerations <br />Due to the dense, generally impermeable nature of the underlying till across the <br />site, we expect that surface run-off will be high. Adequate erosion/siltation control <br />measures should be installed during construction activities. These control measures <br />could include any applicable combination of the following methods; siltation <br />fences, controlled drainage through the construction area, run-off filtration through <br />straw bales and limiting clearing and disturbance of surficial soil outside of the <br />immediate construction area. <br />18 GES, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.