My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br />MEASUREMENT AND PAYMENT PROCEDURES <br />g) "Pre -Apprentice Training Program Fund Contribution Report". <br />0 <br />h) Copies of the'Certified Payroll' with each monthly payment application. <br />4. Final Application for Payment: Refer to Section 01770 Closeout and the General <br />Provisions for other requirements. For application for final payment the Contractor <br />shall included submittal of the following: <br />a) A completed "Application and Certificate for Payment" form showing the Work <br />100% complete. <br />b) Project Record Documents, as required by Section 01729. <br />c) Operations and Maintenance Data, as required by Section 01785. <br />d) Warranties and Bonds, as required by Section 01787. <br />1.03 PREPARATION OF APPLICATIONS FOR PAYMENT <br />A. Type all required information on the forms. <br />B. Submit all information as required. <br />C. Use data on approved Schedule of Values for lump sum bid items. <br />D. Execute certification of signature of authorized officer. <br />E. List each authorized Change Order, listing Change Order number and dollar <br />amount as for an original item of Work. <br />1.04 SUBMITTAL PROCEDURES <br />A. Submit two (2) criginal signed copies of each application for payment at times <br />stipulated in the General Provisions, or at such other times and monthly payment <br />periods as may be mutually agreed upon in writing by the Resident Engineer and <br />the Contractor. Applications are to be submitted to RESIDENT ENGINEER with <br />original signed copies of supporting data for approval. <br />1.05 PAYMENT FOR STORED MATERIAL <br />A. Payment for stored items will be subject to prior approval by Resident Engineer in <br />accordance with the General Provisions. <br />1. On -Site Materials: Progress payments may be made for permanent materials and <br />equipment to be incorporated in the work if approved in advance and properly stored <br />on the project site. <br />B. With payment request for stored material, submit a copy of purchase order and <br />payment voucher clearly identifying the material, specification reference, contract <br />number, and price. The following additional documentation may be included: <br />Capital Projects Commuter Rail 01200 - 3 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 MEASUREMENT AND PAYMENT PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.