My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br />MEASUREMENT AND PAYMENT PROCEDURES <br />4. Section 01323 — Network Analysis Schedules <br />5. Section 01330 - Submittals <br />6. Section 01380 — Construction Photography <br />7. Section 01400 — Quality Control <br />8. Section 01500 — Temporary Facilities and Controls <br />9. Section 01563 — Soil Erosion and Sediment Control <br />10. Section 01575 — Hazardous and Contaminated Substance Health and Safety Program <br />11. Section 01580 — Project Signs <br />C. Initial mobilization shall include obtaining all bonds and insurance, as specified, and <br />shall include, but may not be limited to, the folio; ,ing principal items: <br />1. Moving onto the site of the Work all plant and equipment required in support of the <br />Contractor's first 30 days of operations after Notice to Proceed. <br />2. Obtaining and paying for all permits required to be obtained by the Contractor. <br />3. Submittal of Contractor's Accident Prevention Plan and Project (Site) Specific Health <br />and Safety Plan. <br />4. Establishing all required safety programs. <br />5. Submittal and approval of Schedule of Values, as specified. <br />6. Submittal and approval of Contractor's initial project organization. <br />7. Establishing Contractor's Superintendent on the Work site full time. <br />8. Submittal and approval of detailed CPM progress schedule. <br />9. Submittal of final Submittal Log. <br />10. Submittal of pre -construction photographs and videotapes, as specified. <br />11. Submittal of Inspection and Test Plan. <br />12. Furnishing and installing all temporary facilities and controls as needed for the safe and <br />proper completion of the work, including utilities, sanitary facilities, barriers and <br />enclosures, fences, staging and entrance areas, and field offices, as specified. <br />13. Submittal and approval of Erosion and Sediment Control Plan. <br />14. Submittal of Hazardous and Contaminated Substance Health and Safety Plan. <br />15. Furnishing and installing project signs, as specified. <br />Capital Projects Commuter Rail 01200 - 8 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 MEASUREMENT AND PAYMENT PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.