My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01323 <br />NETWORK ANALYSIS SCHEDULES <br />b.) The identity and logic of activities comprising the CPD4 Progress Schedule shall <br />meet the following criteria: <br />i. Activity descriptions shall contain the area of the Work <br />as well as the specific type of work. <br />ii. Activity boundaries shall be easily measurable and <br />descriptions shall be clear and concise. The beginning <br />and end of each activity shall be readily verifiable, and <br />progress shall be quantifiable. <br />iii. Responsibility for each activity shall be identified with a <br />single performing organization, such as Contractor or <br />specific Subcontractor. <br />iv. Each activity shall be assigned a sort code relating to the <br />dKision of the Work for area of Work, type of Work, and <br />responsibility. The schedule reports shall be able to be <br />sorted by code for reporting purposes. <br />Activity duration over fifteen (15) working days shall not <br />be used except for non -construction activities such as <br />shop drawing and sample submittals, fabrication and <br />delivery of materials and equipment, concrete curing, <br />and General Conditions activities. Activities generally <br />shall not have a duration less than (5) working days. <br />vi. Activity duration shall be in working days as defined by <br />calendars created by the Contractor in the scheduling <br />software. However, the Contract Time shall be in <br />calendar days. <br />vii. Potential problems or constraints related to the <br />implementation of the construction plan shall be <br />identified in writing. <br />viii. Foreseeable delays to activities, such as normal <br />seasonal weather, shall be considered and included in <br />the planning and scheduling of all work. <br />ix. Imposed completion dates for events other than Final <br />Acceptance (end of the Contract Time) are not <br />permitted. Artificial constraints are also not permitted. <br />The methods used for imposing constraints shall be <br />mutually agreed upon by the Contractor and Resident <br />Engineer. <br />3. The submittal of the CPM Progress Schedule documents shall include: <br />91 <br />Capital Projects. Commuter Rail 01323 - 4 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 NETWORK ANALYSIS SCHEDULES <br />
The URL can be used to link to this page
Your browser does not support the video tag.