My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01323 <br />NETWORK ANALYSIS SCHEDULES <br />a.) A plotter -generated time -scaled network diagram, minimum size of 11 inches by <br />17 inches, showing activity descriptions, duration and relationships between <br />activities. The critical path shall be easily identifiable. <br />b.) The following reports: <br />i) Three sorts of the standard CPM report, including, as a minimum, activity <br />numbers, descriptions, early and late start and finish dates, and total float; <br />the required sorts shall be (1) by activity number, (2) by early start by total <br />float, and (3) by total float by early start. <br />ii) Predecessor/successor report, showing the above information plus the <br />predecessors and successors for each activity. <br />c.) A narrative that explains the Contractor's intended methods and means that will <br />be the basis for the Contractor's determination of construction logic and estimated <br />durations. The Contractor shall provide a formal presentation of the approach the <br />Contractor will take to complete the project within the critical and contractual <br />completion dates. The Contractor shall address mobilization, staging, phasing, <br />deliveries, and resources needed for the project. <br />d.) A 3-1/2" computer diskette or compact disk containing the schedule data file, <br />including all layouts and filters. The data shall be written to disk using the backup <br />routine within the Primavera software. <br />4. The Resident Engineer will review the Contractor's CPM Progress Schedule, including <br />logic diagrams and computer -generated analysis. The Resident Engineer will have <br />nine (9) calendar days to review and approve the complete submittal of the CPM <br />Progress Schedule, or to providE comment in writing. <br />5. If necessary, the Contractor shall revise and resubmit the Schedule within fourteen (14) <br />calendar days. The Resident Engineer will have seven (7) calendar days to review and <br />approve, or to comment on the revised Progress Schedule. <br />6. Within seven (7) calendar days following approval of the Schedule by the Resident <br />Engineer, the Contractor shall provide a diskette of the Progress Schedule, with any <br />comments incorporated, to the Resident Engineer. This final schedule is the approved <br />baseline schedule for the project. <br />7. Approval by the Resident Engineer of the Contractor's CPM Progress Schedule shall <br />not relieve the Contractor of the responsibility for accomplishing the Work within every <br />Contract required Milestone and Completion date. <br />B. DELETED. <br />Capital Projects Commuter Rail 01323 - 5 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 NETWORK ANALYSIS SCHEDULES <br />
The URL can be used to link to this page
Your browser does not support the video tag.