My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01323 <br />NETWORK ANALYSIS SCHEDULES <br />date. The activity times used in the Time Impact Analysis shall be those included in the ,r <br />latest CPM Progress Schedule update. <br />B. Extensions of time for performance will be granted only to the extent that such revisions <br />affect the critical path for the project. The time for the changed activity and related activities <br />will be evaluated by the Resident Engineer based on the Time Impact Analysis and the <br />current updated schedule. <br />C. Each Time Impact Analysis shall be submitted within !en (10) calendar days after a delay <br />occurs or notice of direction for proceeding with a change order is given to the Contractor. If <br />the Contractor does not submit a Time Impact Anz.1;3is within the specified time period, the <br />Contractor's rights to any additional time may be waived. <br />D. Approval or rejection of each Time Impact Analysis will be made within fourteen (14) <br />calendar days after receipt, unless subsequent meetings and negotiations are necessary. A <br />copy of the approved Time Impact Analysis shall be incorporated into an approved Change <br />Order. The changes to the schedule shall be incorporated into the Progress Schedule <br />during the first update after agreement is reached on any time extension. <br />The Contractor agrees that it shall not be entitled to a time extension due to normal <br />inclement weather, which can include precipitation, snow, temperature or other weather <br />conditions »' the areas of contract Work. The Resident Engineer will determine if conditions <br />exceed those of normal inclement weather. A time extension for weather will only be <br />considered if the weather is determined to be abnormally inclement and the critical path is <br />affected by that abnormally inclement weather. <br />1.10 RECOVERY SCHEDULE <br />A. Should any of the conditions exist, such that certain activities shown on the Contractor's <br />Progress Schedule fall behind schedule to the extent that any of the Contract critical or <br />completion dates are in jeopardy, or the Contractor is falling behind more that 15 calendar <br />days, the Contractor shall, at no extra cost to Sound Transit, prepare and submit to the <br />Resident Engineer a recovery schedule. The recovery schedule shall be in a form and <br />detail, appropriate to the need, to explain and display how those activities will be <br />rescheduled to regain compliance with the Progress Schedule. <br />B. After determination of the requirement for a Recovery Schedule, the Contractor shall, within <br />seven (7) calendar days, submit a Recovery Schedule to the Resident Engineer. The <br />Recovery Schedule shall be prepared from the current Progress Schedule. The Resident <br />Engineer will have seven (7) calendar days to review and approve the Recovery Schedule <br />submittal. <br />C. Any revisions necessary because of this review shall be resubmitted by the Contractor for <br />approval within !hree (3) working days. The approved Recovery Schedule shall then be the <br />schedule that the Contractor shall use in planning, organizing, directing, coordinating, <br />performing and executing the Work to regain compliance with the Progress Schedule. <br />1.11 SHORT DURATION SCHEDULES <br />A. Throughout the progress of the Work, the Contractor shall prepare and maintain a three- <br />week bar chart field schedule, developed in Prmavera or Excel, reflecting the schedule of <br />work activities accomplished for the current week and the Work scheduled for the <br />forthccming two weeks. This bar chart shall conform to the comruterized CPM schedule, <br />Capital Projects Commuter Rail 01323 - 8 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 NETWORK ANALYSIS SCHEDULES <br />