Laserfiche WebLink
SECTION 01400 <br />QUALITY CONTROL <br />4. Date test was conducted <br />5. Name of technician <br />6. Acceptance criteria <br />7. , -suiis <br />8. Authorized signature. <br />T. Contractor or Subcontractor personnel performing special processes (e.g., welding, <br />soldering, HDPE installation) shall be qualified in accordance with applicable codes, <br />standards, and manufacturers' recommendations. Qualification records of personnel <br />performing special processes shall be current, pertinent to the work performed, and <br />maintained on the Work site. Submit qualification records of personnel performing special <br />processes to the Resident Engineer prior to these personnel starting work on the Project. <br />1.06 QUALITY ASSURANCE, TESTING AND INSPECTION SERVICES TO BE PROVIDED BY <br />SOUND TRANSIT <br />A. Sound Transit intends to maintain the services of an Independent Testing and Inspection <br />Agency as part of the Resident Engineer's construction management team. <br />B. The Resident Engineer testing program is intended to verify that the Contractor's quality <br />control program is operating effectively, and that the Work has been completed in <br />accordance with the Contract Documents. <br />C. The Resident Engineer will provide additional testing in instances where local jurisdictions or <br />regulations require that an independent check (Special Inspection) be performed on portions <br />of the Work. This additional independent testing will not relieve the Contractor from total <br />responsibility for the quality and contract compliance of every part of the Work. <br />D. Sound Transit's Independent Testing and Inspection Agency is not authorized to do the <br />following: <br />Release, revoke, alter, enlarge or modify any contract document requirement. <br />?. Approve, accept or reject any portion of the work, except as specified by the Resident <br />Engineer. <br />3. Perform any duties of the Contractor or subcontractor. <br />4. Approve or authorize additional work. <br />5. Advise or instruct the Contractor or Contractor's employees as to prosecution of the <br />work. <br />6. Slop work. <br />E. Sound Transit may perform audits and surveillances on and off site during any phase of the +^ <br />Work. Audits are multi -day functions, which include scheduled reviews of the Contractor's _ <br />Capital Projects Commuter Rail 01400-11 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 QUALITY CONTROL <br />