Laserfiche WebLink
evaluation o( anv Subcontraclor's "resoonsibilitv" and lhat the Subcontractor is <br />properly licensed reqistered or certified as appiicable The Contractor shall <br />require all Subcontractors to comply with all provisions of this Contract and shall <br />pass down the requirements of this Contract to its Subcontraclors so that all the <br />provi�ions of this Contract are fullv effective. <br />D. No Work shall be subcontracted to new Subcontractors without written <br />notification lo Sound Transit on a form provided bv Sound Transit. No <br />substitutions shall be made for anv Subcontractor who hac been previouslv <br />identified as doinq work on the Co,itract without written notification to. and <br />aa�p;oval bV Sound Transit The Contractor's Request for Substitution oF <br />Subcontractors shall be made on a form provided bV Sound Transit. <br />E Subcontractinq shall create no contract between Sound Transit and the <br />Subconlractor nor shall the Subconlractor have anv riqhts aqainst Sound Transit <br />lhe Conlraclor o( anv oi the Contractor's obliqations or liabilities under the <br />Contract. <br />F The Contr�ctor shall be (ully responsible and liable for the acts or omissions of all <br />Subconlraclars and Suppliers includinq persons direcUV ar indirectiv emploved bv <br />them tl�eir quests and invitees The Contractor shall have sole responsibililv for <br />manaqinq and coordinatinq the operations of its Subcontractors and Suppliers <br />includinq lhe setllement of disputes with or between them <br />G If a Suhcontractor's work fails to meet Contract requirements or demonstrates <br />c�reless or unacceptable workmanship and the Subcontractor fails to respond to <br />notice of such defective work or to improve workmanshiq the Resident Enqineer <br />may direct lhe Contractor to replace the Subcontracror in which event the <br />Subconlractor shall not aqain be emplovPd on the Work under the Contract. <br />H The on-site production of materials produced bv other than the Contractor's <br />forces shal� be considered as subcontracted The erection, establishment, or <br />reopPninq of on-site plants for production of malerials and the operation thereof <br />in the oroduction ot said materials for use on the Work shall conform to the <br />requirements relatinq to labor and insurance set forth in the Contract Documents. <br />SP-3.02 COORDINATION WITH OTHERS <br />Section 3.02 of the General Provisions is modified as follows: <br />Amend Section 3.02, Coordination with Others, by appending the following paragraphs: <br />D. Work within City Vehicle Maintenance Yard <br />'fhe Contractor shall coordinate work within the City of Everett maintenance yard <br />with the Yard Manager. The contact person is Bill De Rousse (425-257-7250) or <br />Bob Carlson (425-257-8920). The work in the yard occurs on the easf side of Hill <br />Avenue in the vicinity of Station 1003+00. <br />The maintenance yard chain link security fence must be in-place except during <br />the periods when the Contracior is actively working in its irtimediate vicinity and <br />Capital Pro�ecis Commuler Raii Specia� Provisions IFB No. RTAICP 21-06 <br />� Everell Slation Phase 2 Section 00300 Page 3 Addendum No. 4 <br />