My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. <br />F <br />G. <br />damage to the fence rnay occur if not removed. Fence must be restored prior to <br />end of work each day. <br />Minimize the disturbed area within the maintenance yard. Trench top-of-bank <br />width should be minimized by use of approved support practices. <br />Work includes restoring maintenance yard fencing, landscaping and pavement <br />upon complelion of work. Pavement shall be restored in a�curdance with City of <br />Everett Standard Drawing 316. <br />Contractor shall allow for City vehicle access within the maintenance ha��ard <br />during construction. <br />The City property shall be cleaned prior to completion of work. <br />The Contractor shall submit a sc.hedule for work within the maintenance yard for <br />approval by the yard manager. <br />PSE Gas Line <br />A PSE inspector is required to be on site when any work is done around high <br />pressure mains. The contact for coordination of work is: <br />Maiiamne Kingsbury <br />Municipal Construction Planner <br />Office — 425-356-7511 <br />Cell - 425-418-7023 <br />FAX — 425-356-7525 <br />Mariamne.kinasburv onpse.com <br />City of Everett Water Line <br />The City of Everett requires an inspector be on site when work is performed <br />around their existing 48-inch water line. The contact for coordination is: <br />Paul McKee <br />425-257-8867 <br />Business Access <br />The Contractor shall maintain ingress and egress to abutting properties on 33rd <br />Street and along the eastern edge of the east parking lot. Temporary closures <br />shall be coordinated w?th the abutting owner, with the authorization of the <br />Resident Engineer. Construction of driveways and other features may be <br />required to be done in stages. <br />SP-3.08 NON•CONFORMING WORK <br />Seclion 3.08 of the General Provisions is modified as foltows: <br />Capital Projects Commuler Rail Special Provisions IFB No. RTA/CP 21-06 <br />� Everett Station Phasr: 2 Section 00300 Page 4 Addendum No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.