Laserfiche WebLink
E. <br />F <br />G. <br />damage to the fence rnay occur if not removed. Fence must be restored prior to <br />end of work each day. <br />Minimize the disturbed area within the maintenance yard. Trench top-of-bank <br />width should be minimized by use of approved support practices. <br />Work includes restoring maintenance yard fencing, landscaping and pavement <br />upon complelion of work. Pavement shall be restored in a�curdance with City of <br />Everett Standard Drawing 316. <br />Contractor shall allow for City vehicle access within the maintenance ha��ard <br />during construction. <br />The City property shall be cleaned prior to completion of work. <br />The Contractor shall submit a sc.hedule for work within the maintenance yard for <br />approval by the yard manager. <br />PSE Gas Line <br />A PSE inspector is required to be on site when any work is done around high <br />pressure mains. The contact for coordination of work is: <br />Maiiamne Kingsbury <br />Municipal Construction Planner <br />Office — 425-356-7511 <br />Cell - 425-418-7023 <br />FAX — 425-356-7525 <br />Mariamne.kinasburv onpse.com <br />City of Everett Water Line <br />The City of Everett requires an inspector be on site when work is performed <br />around their existing 48-inch water line. The contact for coordination is: <br />Paul McKee <br />425-257-8867 <br />Business Access <br />The Contractor shall maintain ingress and egress to abutting properties on 33rd <br />Street and along the eastern edge of the east parking lot. Temporary closures <br />shall be coordinated w?th the abutting owner, with the authorization of the <br />Resident Engineer. Construction of driveways and other features may be <br />required to be done in stages. <br />SP-3.08 NON•CONFORMING WORK <br />Seclion 3.08 of the General Provisions is modified as foltows: <br />Capital Projects Commuler Rail Special Provisions IFB No. RTA/CP 21-06 <br />� Everett Station Phasr: 2 Section 00300 Page 4 Addendum No. 4 <br />