My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Replace Section 3 08 Non-Conforminq Work, with the followinq: <br />A. If Sound Transit datermines that r:�aterial, equiarnent or workmanship oroposed <br />for or incorporated in tli� Work is non-conforminq. Sound Transit shall have !he <br />riqht to reiect such Work bv qivinq the Contractor written notice that such work is <br />non-conformina Sound Transit at its option shall require the Contractor within <br />a desiqnated time period as set forth bV Sound Transit to either (1) promptiv <br />reGair, replace or correct ali Work not periormed in accordance with the Contract <br />at no cost to Suund Transit� or (2) provide a sui!able corrective ac!ion plan at no <br />cost to Sound Transit Sound Transit mav also provide a suitable corrective <br />correctina all Work not performed in accordance with the Contract at no cost to <br />Sound Transit Once accepted or directed bv Sound Transit the Contractor shall <br />imqlemenl the corrective action olan at no cost to Sound Transit. If the corrective <br />action plan as accepted or directed bv Sound Transit does not remedV the <br />defective or non-conforminq Work the Contractor shall remain resoonsible for <br />remedvinq the non-conforminq Work to Sound Transit's satisfaction and at no <br />additional cost to Sound Transit The Contractor shall also be responsible for <br />repairinq all propertv and work damaqed bv the Contractor at n� cost to Sound <br />TransiL Under no circumstances shall the Contractor be entitled to additionai <br />time or moneV for ihe correction of defective or non-conforminq work or (or the <br />reuair of damaqed propertv. <br />B. Sound Transit mav retain WorK that is not in conformance with tiie Contract <br />Documents if Sound Transit determines that such non-conforminq VVork does <br />not adverselv affect the Proiect or if removal of such Work will create conditions <br />that are danqerous or undesirable A reasonable value for such non-conforminp <br />Work will he determined bv Sound Transit and appropriate deductions will be <br />made in lhe oavments due or to becorne due to the Contractoc Final acce tp ance <br />will not act as a waiver of Sound Transit's riqht to recover from the Contractor an <br />amount representinq the deduction (or retention of non-conforminq VJork. <br />full conformance with the Contract Documents. No failure or forbearance of <br />Sound Transit in notifyinq lhe Contractor of r�on-conforminq Work shall relieve <br />the Contractor of its Contr�ct responsibilitV to ensure that the Work is performed <br />in accordance with the Contract Documents. <br />SP-6.01 CONTRACT TIME <br />Section 6.01 of the General Provisions is modified as follows: <br />Repl:�ce paragraph C of Section 6.01, Contract Time, with the following: <br />Capital Projects Commuter Rail Speciai Provisions IFB No. RTAICP 21-06 <br />� Everett Station Phase 2 Section 00300 P�qe 5 Addendum No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.