Laserfiche WebLink
Replace Section 3 08 Non-Conforminq Work, with the followinq: <br />A. If Sound Transit datermines that r:�aterial, equiarnent or workmanship oroposed <br />for or incorporated in tli� Work is non-conforminq. Sound Transit shall have !he <br />riqht to reiect such Work bv qivinq the Contractor written notice that such work is <br />non-conformina Sound Transit at its option shall require the Contractor within <br />a desiqnated time period as set forth bV Sound Transit to either (1) promptiv <br />reGair, replace or correct ali Work not periormed in accordance with the Contract <br />at no cost to Suund Transit� or (2) provide a sui!able corrective ac!ion plan at no <br />cost to Sound Transit Sound Transit mav also provide a suitable corrective <br />correctina all Work not performed in accordance with the Contract at no cost to <br />Sound Transit Once accepted or directed bv Sound Transit the Contractor shall <br />imqlemenl the corrective action olan at no cost to Sound Transit. If the corrective <br />action plan as accepted or directed bv Sound Transit does not remedV the <br />defective or non-conforminq Work the Contractor shall remain resoonsible for <br />remedvinq the non-conforminq Work to Sound Transit's satisfaction and at no <br />additional cost to Sound Transit The Contractor shall also be responsible for <br />repairinq all propertv and work damaqed bv the Contractor at n� cost to Sound <br />TransiL Under no circumstances shall the Contractor be entitled to additionai <br />time or moneV for ihe correction of defective or non-conforminq work or (or the <br />reuair of damaqed propertv. <br />B. Sound Transit mav retain WorK that is not in conformance with tiie Contract <br />Documents if Sound Transit determines that such non-conforminq VVork does <br />not adverselv affect the Proiect or if removal of such Work will create conditions <br />that are danqerous or undesirable A reasonable value for such non-conforminp <br />Work will he determined bv Sound Transit and appropriate deductions will be <br />made in lhe oavments due or to becorne due to the Contractoc Final acce tp ance <br />will not act as a waiver of Sound Transit's riqht to recover from the Contractor an <br />amount representinq the deduction (or retention of non-conforminq VJork. <br />full conformance with the Contract Documents. No failure or forbearance of <br />Sound Transit in notifyinq lhe Contractor of r�on-conforminq Work shall relieve <br />the Contractor of its Contr�ct responsibilitV to ensure that the Work is performed <br />in accordance with the Contract Documents. <br />SP-6.01 CONTRACT TIME <br />Section 6.01 of the General Provisions is modified as follows: <br />Repl:�ce paragraph C of Section 6.01, Contract Time, with the following: <br />Capital Projects Commuter Rail Speciai Provisions IFB No. RTAICP 21-06 <br />� Everett Station Phase 2 Section 00300 P�qe 5 Addendum No. 4 <br />