My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. The Contractor shall comply with all local requirements and permit <br />conditions relating to acceptable hours of operation for construction sites, <br />and to noise control and abaternent. Limit the hours of Work, for all <br />Work-related a�tivities, to the following schedule, unless otherwise further <br />constrained hy permits or agreemPnts or approved by the Resident <br />Engineer. <br />Weekdays <br />Saturdays: <br />Sundays: <br />7:00 AM (OR after the last Sounder Cammuter Train has <br />left Everett Station) to 5:15 PM. <br />: �� _u . �� •� <br />8:00 AM to 5:00 PM. <br />If the Contractor deems that a waiver of any local requirements is <br />necessary to enable the Contractor to perform the Work in accordance <br />wi!h the Contract requirements, it is the Contractor's responsibility to <br />obtain said waivers, at no additional cost to Sound Transit. Submit a <br />schedule of working hours revised in accordance with such local waiver to <br />the Resident cngineer. The Contractor shall be liable for the costs of <br />Sound Transit's unscheduled overtime inspection. <br />Amend Section 6.01, Contract Time, by appending the foliowing paragraph: <br />E. <br />SP-6.09 <br />Contract Time and designated Contract Milestones, including <br />intermediate and/or final completion dates, shall be as follows: <br />1. The Contract Time is 299-270 calendar days after date of the Not�ce <br />to Proceed (NTP). <br />2. Requirements for Substantial Completion of any portion of the Work of <br />this Contract are as specified in ��ecification Section CLOSEOUT. <br />SAFETY CERTIFICATION TESTING <br />Section 6.09 of the General Provisions is deleted in i!� entirety. <br />SP-6.16 ORDER OF V'JORK <br />Section 6.16 of the General Provisions is modified as follows: <br />Replace Section 6.16, Grder of Work, with the following: <br />A. The sequence and limitations of construction are dictated by the specific <br />characteristics of the Work and the Site. The Contractor shall comply with and <br />ir�clude in its Construction Schedule the limitations of Work specified herein. <br />B. The Contractor s�iall commence work immediately upon Notice to Proceed (NTP) <br />and pursue the Work in an orderly fashion such that the Contract Time is met. <br />The Work shall be carefully sequenced to properly coordinate the Work with <br />activities related to Sound TransiPs other construction activities, coordination with <br />Capital Projects Commuler Rail Special Pre,visions IFB No. RTA/CP 21-06 <br />� Everett Stalion Phase 2 Seclion 00300 Page 6 Addendum No. 4 <br />�l; <br />
The URL can be used to link to this page
Your browser does not support the video tag.