My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01110 <br />SUMMARY OF WORK <br />2. Temporary Erosion and Sediment Control <br />3. Rough and Finish Site Grading <br />4. Concrete Curbs and Gutters <br />5. Passenger Platforms and Commuter Rail and Amtrak coordination with BNSF. <br />6. Site Storm Drainage and Utilities <br />7. Asphalt Paving (parking lot) <br />8. Concrete Paving (sidewalks and driveways). <br />9. 'rlagstone and Unit Stone Paving and Granite strip. <br />10. Tactile Warning tile <br />11. Parking and Platform Pavement Marking and Signing <br />1�. Rail and Related Storm Drainage Construction <br />c <br />13. Also included in this scope are the street improvements to Hill Avenue and 33rd Street. <br />C. Site Lighting and Underground Site Electrical Distribution. <br />D. Landsceping. <br />1. Topsoil and Amendmenis <br />2. PIaN Materials, including Trees, Shrubs, Ground Covers and Turf. <br />3. Gravel and Crushed Stone Paving <br />4. Edging <br />E. Landscape Irrigation System. <br />F. Site Furnishings, i;icluding Stone Bench, Pre-manufactured Benches, Trash Receptacles <br />Bicycle Lockers and Racks, Tree Grates, and Trench Drains. <br />G. Ornamental and Ciiain Link Fences and Gates. <br />H. Art Work consisting of (5) granite stone pieces installed on the site. <br />I. Integrated Work. <br />1. PROVISIONS FOR EVERETT LAYOVER FACILITY EXPANSION scope of work under �} <br />Capital Projects Commuter Rail 01110 - 2 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 SUMMARY OF WORK Addendum No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.