My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01110 <br />SUMMARY OF WORK <br />This subseclion will be in accordance with drawings GA-99, C-602 C-611 C•612, C-613. C- <br />712, in addition lo the rest of the contract documents, and includes a) through g) and all <br />other associated requirements. <br />a) Sanitary Sewer Main and lateral for fulure toilet dump. <br />b) Sanitary Sewer flushing manhole and Control Valve Box Chamber. <br />c) Flushing Manhole Control Panel Foundation. <br />d) Water line for future layover tacility. <br />e) Air compressor line. <br />f) Electrical ductbank, conduits and electrical pull boxes. <br />g) And all other associated requirements as shown on drawings 6A-88- C-602, <br />C-611 C-612. C-613 and C-712. <br />1.02 LOCATION <br />A. The Work area is located in Everett, Washington. The project is located at 3232 Hill <br />Avenue. The project site is bounded by Hill Avenue on the East, 33rd Slreet on the South, <br />BNSF Railway on the West and Facific Avenue on the North. <br />1.03 PROJECT LOGISTICS <br />A. The Contraclor shatl access the construction site on and off using the routes shown on the <br />drawings. <br />B. The Contractor �nay periodically be required to stage construction operalions off Pacific <br />Avenue. Construction work in this area must be reviewed, coordinated and approved by <br />Sound TransiCs Residenl Engineer, as well as the City of Everett. <br />1.04 CON'fINUITY OF FACILITIES <br />A. Existing City of Everett, County of Snohomish utilities, streets and facilities, except as <br />indicaled in the Contract Documents, will remain in operation throughout performance of lhe <br />Work. Shutdowns of such utiliiies, streets and facilities and interference with normal <br />operations and maintenance is prohibited without written authorization irom City of Everett <br />andlor Snohomish County PUD. <br />1.05 CONTRACTOR'S USE OF PREMISES <br />A. It is assumed that existing facilities outside the scope of the Work are in good repair. <br />Damage or defects noiiced by lhe Coniractor shall be reported to the resident engineer <br />immediately and prior to ihe start of Work. Damage caused by the Contractor shall be <br />repaired andlor replaced to a condition equal to or better lhan that existing prior lo the <br />damage, at no additional cost to Sound Transit. <br />B. Community Relations <br />Capital Projects Commuter Rail 01110 - 3 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 SUMMARY OF WORK Addendum No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.