Laserfiche WebLink
ATTACHMENT A TO SECTION 01900 <br />REVISIONS TO THE STANDARD PLANS AND SPECIFICATIONS <br />conforminp to ihe req�irements of AWWA C800 minimum 150 psi workin4 oressure. <br />Construction Requirements <br />the tunnel, reduce draq <br />extraction system shall be used to remove anv excess spoils aenerated durinq the <br />other than tlie eniry and exit points shali be minimized. Anv drillinp iluid that surfaces <br />fracturinp shall be used as necessarv durina drillinp ooerations. <br />The conduit ends shall be caAqed with location marked or stubbed-up as indicated in the <br />Piar�s. <br />SIDE SEWERS <br />Construction Renuirements <br />Section 7-18.3(1) is supplemented with the following: <br />Side sewers shall be consiructed in accordance with all regulations, including the City oi Everett <br />Design and Construction S�andards and Specifications tor Deve�opment. Side sewers shall be <br />installed in con(ormance with City of Everett Standard Drawings o i 1, 612, and 615 as revised bv <br />tliese soecial provisions. Testinq shall be performed in tlie presence of ihe Resident Enaineer in <br />accordance witL Sectioi; 7-17?(2) o( the Standard Specifications. <br />SEWER CLEANOUTS <br />Desc�•iption <br />Sectiun 7-19.1 is supplemented with lhe following: <br />; -� <br />Capital Projects Commuter Rail Attachment A to Seciion 01900 - 24 IFB No. RTA/CP 21-06 <br />� Everett Station Phase 2REVISIO�IS TO THE STANDARD PLANS AND SPECIFICATIONSAddendum No.4 <br />