My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A TO SECTION 01900 <br />REVISIONS TO THE STANDARD PLANS AND SPECIFICATIONS <br />Materials <br />Materials shall meet the requirements of Section 6-02.2 of the WSDOT Standard Specifications. <br />Design Requirements <br />The minimum design loads shall be in accordance with ASTM C 890 and AASHTO "Standard <br />Specifications for Highway Bridges", HS-20 All joints and vvelds shall be made watertight and provided <br />with water stops. Treatment of joints and weids in the iield after the vault installation may be necessary. <br />Due to potential high groundwater levels the Pre-Treatment Vault wall design shall include a component <br />for hydrostatic lateral pressure. The design shall also resist uplift (orces (buoyancy). The project <br />geotechnical report recommends that a lateral earth pressure value of 90 pcl be used. <br />Vaults shall, at a minimum, meet structur�l requirements for AASHTO H2O-44 loading. Assume two lane <br />widths oi live load run lengthwise. Wh�el loads with full impact sh<,II be concentrated onto ihe vault top <br />when the load path is applied directly through the maintenance/access (manholes} risers. The dead load <br />shall be based on the depth of the pavement, base and fill over the vault (overburden) assumed to weigh <br />125 pounds per cubic toot. <br />All vaulis shall also meet structural requirements for overburden support. Cast-in-place wall sections <br />shall be designed as retaining walls. A structura! engineer licensed in ihe State of Washington shall <br />stamp all structural designs. Vaults shall be placed on 18 inches of crushed surfacing base course <br />overlying competent native soil. <br />All pre-cast concrete manhole sections tor mair,tenancelaccess risers shail meet the requirements of <br />Section 9-12.4 Pre-cast Concrete Manholes of the Standard Specitications, except the hole diameter <br />sliall be as shown in the Plans. <br />Reinforced Concrete Vault Working Drawings <br />The Contractor shall submit complete reinforced concrete vault working drawings and catculations in <br />accordance with Section 6-01.9 of the Standard Specifications. <br />Construction requiremenis shall also be in accordance with Section 6-02.3 oi the WSDOT Standard <br />Specificatio�s. <br />CURBS, GUTTERS AP1D SPILLWAYS <br />Construction Req�irements <br />Cement Concrete Curbs, Gutters and Spillways <br />Section 8-04.3(1) is supplemented by ihe following: <br />Joinis and scoring shall be per the Plans, wilh 1/2" through-expansion joints at beginning of <br />curves, at curb return tangency points, at each side of catch basins, and at driveways. <br />The subbase for cu:b and gutter sections shall be compacted to 95% density at optimum <br />moisture content be(ore placing lhe curb and gutter. <br />The top o( the finished concrete shall not deviate more than 1/8" in 10', nor the aliynment 1/4" in <br />10'. <br />The concrete cur6 will be depressed for wheelchair ramps and driveways. Curb ramps shall be <br />constructed flush with ihe gutter line. <br />At locations �hown in ihe Plans, the Contractor shall consiruct storm drainage frames and <br />grates into cement concrete curb and gutter. <br />Capital Projecis Commuter Rail Attachment A to Sectior� 01900 - 26 IFB No. RTA/CP 21-06 <br />� Everett Station Phase 2REVISIONS TO THE STANDARD PLANS AND SPECIFICATIONSAddendum No.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.