My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 09651 <br />RESILIF►iT TILE FLOORING <br />3.2 PREPARATION <br />A. Prepare eubstrates according lo manufacturer's written instructiors to ensure adhesion of <br />resilient products. <br />B. Concrete Substrates: Prepare according to ASTM F 710. <br />1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners <br />2. Remove substrate coatings and other substances that are incompatible with adhe: ives <br />and iha; cor.tain soap, wax, oil, or silicone, using mechanical methods r=commended by <br />manufacturer. Do nol use soivents. <br />3. Alka!inity and Adhesion Testing: Perform tests recommended by manutacturer. Proceed <br />wilh installalion only after substrales pass testing. <br />4. Moisture Testing: Perform tests recommended by manufacturer and as fotlows. Proceed <br />with instaliation only after substrates pass testing. <br />a. Per(orm anhydrous calcium chloride lest, ASTM F 1869. Proceed with installation <br />only after substrates have maximum moisture-vapor-emission rate of 3 Ib o( <br />waterl1000 sq. ft. in 24 hours. <br />b. Perform relative humidity test using in situ probes, ASTM F 2170. Proceed witii <br />installation only after su!�strales have a maximum 75% relative humidity level <br />measuremenl. <br />C. Fill cracks, holes, and depressions ii� substrates with trowelable levelir.g and patching <br />compour.d and remove bumps and ridges to produce a unitorm and smooth substrate. <br />1. ensure tha! any surace filled is finish�d smocihly with out bumps or ridges <br />D. Do not install floor tiles until they are same temperature as space where they are to be installed. <br />Move resilienl producls and installation malerials into spaces vihere they will be installed <br />at least 48 hours in advance of installation. <br />t. Sweep and vacuum clean substrates to be covered by resilie�t products immediately before <br />installation. <br />3.3 FLOOR TILE INSTALLATION <br />A. Comply with manufacturer's wrilten instructions for installing floor tile. <br />B. Lay out iloor tiles from center marks established with principal walls, discounting minor oHsets, <br />so tilcs at opposile edges uf room are of equal width. Adjusl as necessary to avoid using cut <br />widths that equal less than one-half tile at perimeter. <br />Lay tiles square with room axis. <br />C. Match (loor tiles for color ar.d pattern by selecting tiles from cartons in Ihe same sequence as <br />manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed <br />liles. <br />1. Lay tiles in pattem chosen by arcnilect as shown or request pattem with initial selecticn <br />submittal in not shown <br />2. Ii a pattern with grain is selected lay with grain direction altemating in adjacent tiles <br />(basket-weave pattern). <br />Capital Projccls Commutcr Rail 09651 - 3 IFB No. RTA/CP 21-06 <br />fvcrclt Station Phasc 2 RE:SILIGNT T1LE FLOORING Addendum No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.