My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST LABOR COMPLIANCE 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
LABOR COMPLIANCE
>
2400 33RD ST LABOR COMPLIANCE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:19:48 PM
Creation date
4/1/2017 3:37:46 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
LABOR COMPLIANCE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Use reasonable and practicable means to recruit and hire app�,;ntices to <br />achieve the twenty percent (20%) apprentice utilization goal. <br />c. Use reasonable and practicable means to recruit and hire minority and <br />women apprentices far the Project so that of the apprentice utilization <br />requirement percentage in this Section, the Contractor shall use women <br />and people of color to perform at least fifty percent (50°/a) of all first-year <br />apprentice hours in all trades and to perform at least thirty-three percent <br />(33%) of all apprentice hours worked. <br />d. Comply with the apprenticeship training standards for each trade/craft <br />classification used on the Projec[, as set forth by the Washington State <br />Departmert of Labor and Industries. <br />5. It is expected that an apprentice will normaliy begin training on the Project as <br />soon as feasible after start of work, utilizing the skill involved and remain on the <br />Project as long as training opportunities exist in the work classification or until the <br />completion of the training program. It is not required that all apprentices be <br />retained for the entire length of the Contract. <br />B. Changes to the Apprentice Utilization Requirement <br />If, during the term of the Contract, the Contractor determines that it will be unable <br />to meet the apprentice utilization identified in the Apprer,tice Utilization Plan as <br />accepted by Sound Transit, the Contractor may make a written request to Sound <br />Transit, to modify the Plan. The request shall include documentation of the <br />Contractor's affirmative efforts to use apprentices registered with the Washington <br />Slate Apprenticeship and Training Council ("SAC"), including copies of <br />correspondence between the Contractor and the SAC approved apprentice <br />programs, union locals, FAST Jobs Coalition, and others. The documents must <br />demonstrate that an adequate number of apprentices are not available to meet <br />the apprentice utilization percentage. <br />2. Sound Transit shall evaluate the request, and if appropriate, shall authorize <br />modification of the Apprentice Utilization Plan. If Sound Transit determines that a <br />modification is not justified, Sound Transit shall communicate the decision in <br />writing to the Contractor. <br />C. Apprentice Utilization Monitoring and Enforcement <br />Sound Transit or its designee shall verify the registration of each apprentice used <br />on the Contract with the Washington State Apprenticeship and Training Council. <br />2. Sound Transit or its designee shail monitor the apprentice utilization data <br />provided by the Contractor. In the event that the Contractor is deficient in the <br />use of apprentices, Sound Transit or its designee will meet with the Contractor to <br />discuss the reasons for the deficiency and help the Contractor develop a written <br />plan for meeting the goals. <br />3. Sound Transit may make routine visits to the Site for the purpose of confirming <br />the use of apprentices. The Contractor acknowledges that parties designated by <br />Sound Transit may make visits to the Site for the purpose of confirming the use <br />of apprentices. Said third party visitors will be required to abide by the <br />Contractor's and Sound TransiYs work rules and safety plan. <br />Capilal Projects Commuter Rail Labor Compliance Manual IFB No. RTA/CP 21-06 <br />Everelt Slalion Phase 2 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.