My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10530 19TH AVE SE BASE FILE 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10530
>
BASE FILE
>
10530 19TH AVE SE BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2017 2:35:17 PM
Creation date
4/2/2017 10:29:13 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10530
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' � <br /> ; <br /> 51. The design of sites, buildings, landscaping and signs which are developed on properties abutting the <br /> designed gateway corridors should be of a quality that upgrades and enhances the aesthetic <br /> character of the City in general and the immediate areas in particular. <br /> 52. The City shall work with property and business owners along gateway corridors to develop and <br /> implement streetscape improvement plans both within the public right-of-way and on �roperties <br /> abutting the right-of-way. Such improvement plans shall be coordinated with Snohomish County for <br /> the unincorporated portions of corridors that are located in the Everett Planning Area. <br /> 53. The Washington State Clean Air Act requires the use of all known, available, and reasonable means <br /> of controlling air pollution, inciuding dust. Dust generated during construction activities can be <br /> controlled by wetting those dust sources such as areas of exposed soils, washing truck wheels <br /> before they leave the site, and installing and maintaining gravel construction entrances. <br /> Construction vehicle track-out is also a major dust source. Any evidence of track-out can trigger <br /> violations and fines from the Department of Ecology or the Puget Sound Clean Air Agency. <br /> GENERAL INFORMATION <br /> 1. The Snohomish County PUD currently has sufficient capacity to serve the proposed development. <br /> For further information about the electrical service requirements for this project, please call the <br /> DistricYs Everett Office at (425) 258-8272. <br /> S:\BFauver�SEPA\04-022 FinaI.DOC <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.