Laserfiche WebLink
� ' � <br /> ; <br /> 51. The design of sites, buildings, landscaping and signs which are developed on properties abutting the <br /> designed gateway corridors should be of a quality that upgrades and enhances the aesthetic <br /> character of the City in general and the immediate areas in particular. <br /> 52. The City shall work with property and business owners along gateway corridors to develop and <br /> implement streetscape improvement plans both within the public right-of-way and on �roperties <br /> abutting the right-of-way. Such improvement plans shall be coordinated with Snohomish County for <br /> the unincorporated portions of corridors that are located in the Everett Planning Area. <br /> 53. The Washington State Clean Air Act requires the use of all known, available, and reasonable means <br /> of controlling air pollution, inciuding dust. Dust generated during construction activities can be <br /> controlled by wetting those dust sources such as areas of exposed soils, washing truck wheels <br /> before they leave the site, and installing and maintaining gravel construction entrances. <br /> Construction vehicle track-out is also a major dust source. Any evidence of track-out can trigger <br /> violations and fines from the Department of Ecology or the Puget Sound Clean Air Agency. <br /> GENERAL INFORMATION <br /> 1. The Snohomish County PUD currently has sufficient capacity to serve the proposed development. <br /> For further information about the electrical service requirements for this project, please call the <br /> DistricYs Everett Office at (425) 258-8272. <br /> S:\BFauver�SEPA\04-022 FinaI.DOC <br /> 10 <br />