My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11325 19TH AVE SE 2018-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
11325
>
11325 19TH AVE SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2019 1:46:23 PM
Creation date
4/2/2017 12:53:37 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11325
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Accesa must be provided to the first cell of the pond to <br /> facilitate ft�.ture sediment removal. A fifteen foot wide <br /> qravel access road to the bottom of the pond, with a minimum <br /> compacted thickness of six inches and a maximum slope of <br /> 6:1, is called for in the standards. The cell volume would <br /> should then be increased to compensate for the volume <br /> dieplaced by the road. <br /> The berm between the two cells should be prote�ted aqainst <br /> , eroeion. Quarry spalls or rip-rap, placed 6-12 inches thick <br /> alonq the top of the berm and down the sides for a short <br /> distance, should be adequate. <br /> Pioina <br /> The City allows PVC to have a minimum cover of 3 feet. <br /> The pipe from catch basin ,�7 to the first cell of the <br /> wetpond should probably be raised to prevent accumulation of <br /> sediment in the pipe. If the pipe is raised, rip-rap should <br /> be placed at the outlet to to the bottom of the pond. <br /> Rip-rap should be placed at the outlet of all pipes <br /> discharging into swales or wetponds. <br /> A trash rack should be placed on the 12 inch PVC pipe <br /> conveying flow from the biofiltration swale to catch basin <br /> ,}7, and on the existing 12 inch concrete pipe at the <br /> downstream end of the 33 foot long section of biofiltration <br /> swale adjacent to SR 527. <br /> The outlet pipe from the second cell of the wetpon3 must <br /> have sufficient cover along its length to allow safe removal <br /> of sediment in the future. The pipe should have at least 2 <br /> feet of protection both horizontally and vertically. <br /> Per City standarde, a catch basin or manhole is required at <br /> changes in storm pipe alignment - the pipe from the overflow <br /> atructure must tie into the storm system at a catch basin or <br /> manhole. <br /> Miscellaneous: <br /> The top and toe elevations of all rockeries adjacent to or <br /> associated with stormwater facilities must be given. <br /> It is important to leave enough horizontal room for <br /> rockeries. City of Everett standards require a minimum of 4 <br /> feet, even for a rockery under 7 vertical feet. The plans <br /> need to show this distance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.