My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11419 19TH AVE SE LAND USE REVIEW 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
11419
>
LAND USE REVIEW
>
11419 19TH AVE SE LAND USE REVIEW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 1:13:02 PM
Creation date
4/2/2017 1:12:46 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11419
Tenant Name
LAND USE REVIEW
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wayne Wentz <br /> April 10, 1996 <br /> Page 5 <br /> left-turn lane, that would function as a left-turn acceleration lane as there are no conflicting <br /> driveways south to 116th Street. This acceleration/refuge lane and the platooning affect of the <br /> adjacent 116th Street signal would improve traffic conditions for tne critical left-turn egress <br /> movement. <br /> Imoacted Intersectians and Traflic Mitisation Pavments� The proposed commercial <br /> development would impact the following City of Everett or State intersections with ten (10) or <br /> more project trips: <br /> Table 2 <br /> ' Impacted Intersections/Corridors <br /> Mitigation Payments <br /> PEAK TRIF IMPACTS <br /> Intersections/Corridor Project PM Mitigation Futtire % Construction Nliti�ation <br /> with 10+Peek Trips Peak Trips Required Interuction S6are Costs �,st. Payment <br /> ES/NO Pk l7olwne Fee <br /> 116th Street 11 yEs 1,500 0.73 $150,000 1,095.00 <br /> 35th Avenue ' <br /> 112th Street Corridor Mitigation based on daily City/Counry improvement project 5,625.00 ' <br /> Im rovement Pro'ect tri s= 75 ADT 575.00 per ADT <br /> 19th Avenue SE <br /> I lOth Street SE <br /> 19th Avemie For the 19th Ave/SR-527 <br /> l 12th Street SE Improvement Comdor, WSDOT SR-527 Project 74,503.40 <br /> 19th Avenue SE mitigation based on new $ 98.68 per ADT <br /> 116th Street SE daily trips = 755 ADT <br /> 19th Avenue SE <br /> 121st Street SE <br /> TOTAL= 81-223.40 <br /> ' The Counry has planned an improvement along 35th Avenue which would signalize the 116th <br /> S[reeU35th Avenue intersectinn. Estimated future traffic volumes were obtained from the Counry's 1995 <br /> Transporranon Needs Report. <br /> SieeJAccess and Frontage Improvements: The proposed access onto 19th Avenue SE satisfies <br /> minimum sight dis:ance requirements per AASHTO for the posted 35-mph speed (350 feet). The <br /> desirable sight distance is 470 feet. The proposed driveway location has over 500 feet of clear <br /> distance to the south but the curved alignment of 19th Avenue restricts the sight distance to 43G (d <br /> �� <br /> � � ��� <br /> RAFFIC <br /> OO Mn �M��',�;rrsr,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.