Laserfiche WebLink
, , <br /> 3. Please indicate a posted occupancy sign on the drawings for assembly use, per IBC table <br /> 1004.1.1, and IBC sediori 10043. <br /> Construction <br /> 1. New ceilings should be shown on the drawings to comply with the seismic installation details of <br /> NW Ceiling institute, attached. <br /> 2. The wall construction behind and adjacent to the hood should be shown on the drawings to <br /> indicate combustible or non-combustible construction, including the required dimensioned <br /> clearances, per IMC 506.3.6. <br /> 3. The listed assembly for the grease duct endosure system of one hour resistant grease duct fire <br /> wrap should be shown to meet the requirements of ASTM E 2336, raith the required clearances <br /> shown on the drawings, per IMC section 506.3.6, exception 3. <br /> 4. The start and termination of the grease duct fire wrap for the Type I hood ducts should be I, <br /> shown on building sections to extend from the Type I hoods to the outlet terminal, per IMC I <br /> Sedion 506.3.10.2. I <br /> 5. The kitchen ceiling height should be shown on the shown on the building sedions. Where the I <br /> kitchen ceiiing abuts the Type I hood, 18 inches of a smooth, cleanable, nonabsorbent and <br /> noncombustible material should be shown on the drawings between the hood and the ceiliny <br /> material, per the exception to IMC section 507.9. <br /> 6. An elevation should be shown on the drawings where the Type I hood abuks the wall. A <br /> smooth, cleanable, nonabsorbent and noncombustible material should be shown on the <br /> drawings and noted to extend 18 inches in all directions from the hood to the full height of the <br /> hood canopy, and to the base of the floor, per the exception to IMC section 507.9. <br /> 7. Elevations of all new toilet rooms should be targeted on the drawings. A side elevation of the <br /> toilet is also required to show Floor, base and wall treatments, per I8C section 1210. <br /> 8. i�ew doors and existing door sizes and hard�vare should be shown on a schedule Lo comply with <br /> minimum sizes, per IBC sections 1008.1.1 and 1008.1.9.1. <br /> 9. Toilet room exhaust fans cfm sho�dd be shown on new toilet rooms, per IMC table 403.3. <br /> 10.The relocated mop sink should bc positioned so that the clear door width into the kitchen is not <br /> reduced, per IBC 1005.1. <br /> 11.Walls, door locations, and door openings should be dimensione� so lhat someone could build <br /> them from the submitted drawings without having to ask someone else for information. <br /> 12. Electrical panels should not be located in toilet rooms, per NEC section 2370 A (2). Please <br /> darify the new location of the electrical panel for A103. <br /> Accessibility <br /> 1. Accessibility requirements in the drawings submitted for permit will be reviewed for compliance <br /> with adopted state laws. Federal ADA regulations and standards may be more restrictive. The <br /> Americans wilh Disabilities Act is enforced by the Department of Justice. <br /> �3 <br />