Laserfiche WebLink
Ms. Mary Cunningham <br />� Page 2 <br /> June 10, 1991 <br /> SEPA #36-91 <br /> This ro'ect will fall in <br /> P J the present boundaries of Silver Lake <br /> Elementary, Eisenhower Middle School, and Cascade High School, <br /> all over capacity. <br /> The Everett Schuol District has found that each apartment unit , <br /> tiyroughout our service area �enerates .327 students to the <br /> District's student population. With 10 units, this project will <br /> aenerate 3.27 students. <br /> Portables cost $36,000 to construct and locate on site. Twenty-five <br /> (25) students can be housed in each portable. Thus, it costs $1440 <br /> per student to h��use students in portables. <br /> T3,e applicant's mitigation in this case would be 3.27 x $1440 = <br /> $�,7G3.80. <br /> Thank you for the opportunity to respond. <br /> Si►icerely, <br /> C���ZCG.�,/�J���G�.� e�rtJ <br /> Chuck Patten <br /> Director of Community Relations <br />