My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9610 19TH AVE SE NEXTEL ANTENNA 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9610
>
NEXTEL ANTENNA
>
9610 19TH AVE SE NEXTEL ANTENNA 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 10:34:14 AM
Creation date
4/2/2017 2:57:08 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9610
Tenant Name
NEXTEL ANTENNA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Findings: The site is located in a commercially zoned area and is located in the rear of <br />commercial facilities facing 19th Avenue SE. The site was chosen to avoid impacting <br />view corridors located on 19th Avenue SE and Interstate 5. The tower will be a <br />monopole to minimize its profile and will be similar in scale to the light standards located <br />in the I-5 freeway corridor. Equipment shelters will be screened by Type I landscaping <br />designed to create a visual barrier in a three-year period. Further screening will occur as a <br />result of an existing retaining wall located on the property to the southeast and the trees <br />located on the property and in the State right-of-way to the west of the site. <br />Conclusion: Prior to the issuance of Public Works and/or Building Permits for the <br />proposed project, the Applicant must submit a fled landscape plan showing the <br />location, size, and nature of all outdoor equipment and a landscaping plan showing the <br />location, species, number and size of plant materials used to screen the structures and <br />promote compatibility with the surrounding land uses. <br />6. The number, size and location of signs, especially as they relate to more sensitive <br />land uses. <br />Finding: There are no signs proposed for this project. <br />Conclusion: This criterion is not applicable to the proposer! project. <br />7. The landscaping, buffering and screening of buildings, parking, loading and <br />storage areas, especially as they relate to more sensitive land uses. <br />Please See Findings and Conck:sions for SPU Criterion #5. <br />8. The generation of nuisance irritants such as noise, smoke, dust, odor, glare, <br />visual blight or other undesirable impacts. <br />Findings: Following a two -month construction period no smoke, dust or glare will <br />emanate from the site. Noise will be limited to commercial type air conditions and <br />potentially backup generators needed in case of a power failure. It is anticipated that the <br />site activities will not be above ambient noise levels in the area or exceed any noise <br />regulations applicable to commercial areas. <br />Conclusion: Noise levels from the freeway and 19th Avenue SE are much more <br />substantial than the noise which will be generated by the AC units. <br />9. Consistency with the goals and policies of the Everett Comprehensive Plan for <br />the area and land use designation. <br />Findings: The proposed development is consistent with the goals, policies and <br />regulations identified in the Everett Comprehensive Plan and Zoning Code. Specifically, <br />this proposal attempts to address the preference of the City of Everett to: <br />
The URL can be used to link to this page
Your browser does not support the video tag.