Laserfiche WebLink
locate telecommunication facilities in commercial locations and away from residential <br />areas, <br />preserve views from gateway corridors, and; <br />facilities to avoid tower proliferation. <br />provide for colocation of wireless <br />Conclusion: The proposed project is consistent with the General Plan for the B-2 zone <br />and also the City's new Telecommunications Ordinance. <br />lo. Compliance with the provisions of this ordinance and other City, State, and <br />Federal regulations. <br />Findin : A Proposed Mitigated Determination of Non -Significance (SEPA 893-98) was <br />issued on October 22, 1998 for the proposed construction of a 150 foot monopole at 9610 <br />19th Avenue SE in the B-2 zone. The proposed monopole will require a Special Property <br />Use Permit, Variaace, and a Building Permit from the City's Building Department. <br />Operation of the facility will require compliance with licensing requirements of the Federal <br />Communications Commission. <br />Conclusion: The proposed project will be in compliance with <br />ll The apCity plicantOrdinances, <br />State <br />and Federal regulations subject to final SPU and FCC app <br />obtain a Building Permit for construction of the proposed project. <br />11. ction measures <br />applicant totlity to r duce depeic transit and traffic ndence of the proposed uuse on he automobile. by the <br />Findin : The facility will be unmanned and will generate very minimal traffic <br />Conclusion: This criterion is not applicable to the proposed project. <br />SPU SPECIFIC EVALUATION CRITERIA: <br />The following findings and conclusions are based on the criteria established in Section <br />41.15o.D.1.a of the Zoning Code - Special Property Use Permits - Evaluation Criteria for <br />Above Ground Utility and Communication Facilities: <br />1. All utility facilities shall be landscaped or otherwise screened to assure <br />compatibility with surrounding properties. <br />Please See Findings and Conclusions under Criteria #7, SPU General Evaluation Criteria <br />(Section 41.150.c). <br />2. All utility and communication facilities shall be installed underground or with <br />structures to the greatest extent practical in order to maximize safety and minimize <br />visual and noise impacts upon surrounding properties. <br />