My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10026 21ST AVE W 2016-01-01 MF Import
>
Address Records
>
21ST AVE W
>
10026
>
10026 21ST AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 2:55:54 PM
Creation date
4/2/2017 4:09:30 PM
Metadata
Fields
Template:
Address Document
Street Name
21ST AVE W
Street Number
10026
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON/2;4/2f105 07:'LA PA\ 415 252 9256 ROBINGiT DEYGI.OP <br />�ooa <br />E, A previous sfudy (Weiland Resources 2002) identified a wetland on both sides of the stream, which <br />if present, would require a 75 foot buffer that would encompass the entire project site. in the report <br />prepared by Wetland Resources for the present project, no wetiand is identified, citing changes in <br />Department of Ecology's interpretations. This decision does not resoive that apparent <br />inconsistency. As a reasonable �se is fnund to be appropr�ate regardless of the deas oclhe n and <br />buffer widlh, this decision does not make, nor cloes it rel!r upon, a definitive finding <br />reaulated buffer widih. <br />F. The request is to aitow an encroachment into :he 25 foot :stream buffer of 5 to 12 feet to allow a <br />singie family residonce with 1,120 s.f. building `ootprint, a 1,000 s.f. rear yard and a five foot side <br />yard. <br />�, Poteniial impacts of the proposed development would inr,lude increased stormwater runoff, reduced <br />stormflow attenuation, and reduced wildlife habitat. <br />qpproval Criterla <br />1. There is no other reasonable use or feasible alternative to the praposed development wi4h less <br />impact on the environmentally sensitive area. <br />Poss'ib e alternal es that would havetiess mp ct Inythe sens tive area clude the fo I wing:R 2 Zone. <br />a. reductfon of the size of the buitding and or yard area in order to minimize the deveiopment footprint <br />on the lot, thereby minimizing buffer displacement; <br />b. reorientation of the building so as to increase the distance of the building and yard from the stream; <br />c. issuance of transier of development rights and dedir,aliny the site as permanent open space. <br />The proposal calls for a building footprint of 1,120 syuare feet and a development footprinl (house + <br />yard) of a little more than 3,400 s.f. The proposed orientation of the house is such that the its rtorth- <br />south dimensions are longer than east-west dimensions. This woufd result in the developed yard being <br />as close as 13 feet to the stream. <br />A minimum 25 foot buffer from the stream can reasonabiy be expecied lo be maintained on this <br />property by reducing ihe size of the yard and or Ihe house, or by simply re-configuringfreorienting the <br />house. A reconfic�uration of the house may reduce the proposed additional buffer to the west, however, <br />the increased benefit from ensuriny the stream bufier does not fall below 25 feet should more than <br />compensate ior the buffer impacts to the less sensitive areas that may be caused by the adjustments. <br />Since a reasonable use can be accommodated on the site, transfer of deveiopment rights would not be <br />an appropriate optfon. <br />Conclusion: Based on a revieur of the application and Iho potential impacts identified in the preceding <br />findings, relatively miner modifications to ihe site plan can resuli in improved protection oi the stream <br />�vhile mainlaining the same intensity of the use as proposed. <br />2. The proposed development does not pose a threat to the public health, safety and welfare on or <br />off of the subject lot. <br />�indinc�: The proposal 4vould not have a significant impact on abutting or downstream properties. The <br />project will comply wilh all pertineN zoning, building and public works standards. Additional runo(f from <br />impervious surfaces (i.e., rookops) would he required to meet Public Works standards. <br />,% <br />
The URL can be used to link to this page
Your browser does not support the video tag.