Laserfiche WebLink
The objectives of the Final Reviseo Wedand Mitigation Plan are: <br />a. To resrore a forested/scrub-shrub weNand class, seasonally flc��led/saturared <br />environment around the wedand located on Lot 20, that will inter-connect, both <br />physically and hydrologically, with the newly created wedand to the east; <br />b. To create a neev forested/scrub-shrub wedand east of the restored wedand that would be <br />hydrologically connected; <br />To incresse plant diversiry in both wetlands �y planting a wide variery of trees, shrubs <br />and herbs; <br />d. To enhance the 10 foot wide buffer to the wes� with additional plantings and the removal <br />of Himalayan blackberry; and <br />To enhance the 25 foot buffer to the east with additional plantings so that it would <br />support an increase in small bird and mammal use, in the viciniry of the restored/created <br />wedands. <br />In addition to the proposed wedand mitigation, the required 50 foot buffer located <br />adjacent to the wedand creation area is proposed for a50 percent reduction. The <br />minimum progosed buffer width is 25 feet. Dense plantings within the remaining <br />reduced buffer area (4,000 SF) is proposed for mitigation for the SO percent reduction. <br />The proposed dense plantings will provide excellent wildlife habitat and also an armored <br />physical barrier between the developed portions of the properry and the sensit�ve areas. <br />The proposed filling, creation and restoration of wetlands on Lots 1, 2, and 20 shall be <br />in accordance with the above referenced Wedand Mitigation Plan. In addition to <br />compliance with the Revised Final Wedand Muigation Plan, the Applicant shall ccmply <br />with the following requirements for the proposed filling; restoration and creatiun of <br />wedands on Lots 1, 2, and 20. (SEPA Larth, Land, Plants, and Water Policies) <br />4.1 The Applicant shall utilize a qualified wetland specialist to develo� ancl implement a <br />constructicu plan which specifies reyuirements for excavation, '.rainage, materials stock <br />piling, soil replacement, and plantings. Implementation of the conswction plan will <br />require an eight step pro;ram: <br />0 Preconstruc[ion meeting <br />0 Staking of mitieation boundaries <br />0 Installation of temporary erosion and sedimentation control measures <br />Clearing an;i grubbing, over-excavation of wedands and mitigatio�� area, stockpiling of <br />wedand roil �aterials. and contained root- and seedstock <br />0 Replacement of soil materials <br />0 Plantin� <br />0 Gstablishment of hydrologic regime and satisfaction of post-planting requirements. ; <br />i <br />0 Post construction mceting ' <br />