My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4432
>
Resolutions
>
Resolution 4432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 11:30:29 AM
Creation date
4/4/2017 9:19:55 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4432
Date
5/14/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Signing: A signing plan for entryways shall be submitted and to and approved by the <br /> Planning and Public Works Departments. <br /> 6. All required public improvements (street, utility, drainage) shall be constructed prior to <br /> final PRD approval, unless otherwise approved through a phasing plan. <br /> 7. Detailed drawings in accordance with City Design and Construction Standards shall be <br /> submitted to the Public Works Department showing site parking layout, landscaping, <br /> utilities, storm drainage,temporary construction erosion control, and all required <br /> improvements in the public right-of-way. Public Works Department approval of these <br /> drawings is required prior to any permits being issued. All improvements shall be <br /> completed, approved and warranted before the Occupancy Permit is issued/final approval is <br /> granted. <br /> 8. Full standard(half) street improvements are required to this property's frontage on Upper <br /> Ridge Road, including but not limited to curb, gutter, sidewalks, street widening and <br /> drainage control per City Design Standards. <br /> 9. Parking must be per City Zoning Code and City Design and Construction Standards. For <br /> the 14 units proposed, a minimum of 28 parking stalls must be provided. <br /> 10. On-site detention of stormwater runoff is required per City Standards. Although the Pigeon <br /> Creek#2 Basin plan goals are based on a 5-year storm,predeveloped detention release for <br /> the east fork sub-basin, recent studies have indicated that erosion and incision is occurring <br /> in the east fork of the stream and downstream of the confluence of the east and west forks. <br /> The runoff rate from a 2-year storm prior to development will be required as the detention <br /> release rate for both sub-basins. <br /> 11. Treatment of stormwater runoff from paved areas must occur, per City Standards,prior to <br /> discharge of the stormwater from the site or to a stream or wetland. <br /> 12. Stormwater detention/retention, quality protection, and treatment requirements for this <br /> project shall be those requirements in effect at the time of application for Public Works <br /> permits. Currently,three options for stormwater treatment are presented in the current City <br /> Standards. The least preferred option is allowed only if the first two options are infeasible <br /> in the opinion of the Public Works Department. The options for stormwater treatment are, <br /> in order of preference: <br /> a. an infiltration basin designed and constructed according to City Standards if suitable <br /> soils exist on the site; <br /> b. a wetpond designed and constructed to City Standards; or <br /> c. a baffle-type oil/water separator followed by a vegetated swale, both designed and <br /> constructed according to City Standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.