Laserfiche WebLink
14. The existing R-3 zone requires minimum 5,000 square foot lots. The R-3(PRD) <br /> zone, as proposed, will have smaller lots than R-3 area standards and will have <br /> at least one multiple-family duplex lot. All of the single-family lots will be less <br /> than 3,800 square feet, and the duplex lot, lot #4, will be approximately 5,400 <br /> square feet. With these reduced sized lots, the proposal will be consistent with <br /> the PRD overlay zone. (Exhibit #1 , Wood testimony) <br /> 15. The site is flat with small depressions. The soil type is Alderwood Series, and <br /> there are deciduous and evergreen trees and native grasses on-site. There is a <br /> Class IV wetland immediately south of the subject property. The buffer to the <br /> wetland, 100 feet, extends into the subject property. The Applicant will be <br /> required to mitigate all impacts to the wetlands and buffers. (Exhibit#1, Wood <br /> testimony) <br /> 16. The internal access road of the subject property will extend partially into the <br /> wetland buffer. As a result, the Applicant will be required to provide mitigation <br /> for the 832 square feet of encroachment within the buffer. (Exhibit #1) <br /> 17. The storm drainage of the site will ultimately flow into a detention system on <br /> Tract 999, located near the eastern boundary of the subject property. The <br /> Public Works Department of the City of Everett indicated that the drainage <br /> impacts will be mitigated, and the site can be properly controlled from drainage <br /> damage. (Exhibit #1, Witcher testimony) <br /> 18. Each lot within the proposed subdivision will have a minimum rear yard area of <br /> at least 500 square feet. The City has stated this is adequate for open space <br /> within the subdivision. (Exhibit #1 , Wood testimony) <br /> 19. The proposed subdivision is located in the Mukilteo School District. As part of <br /> SEPA identified impacts of school overcrowding, the Applicant and the school <br /> district will enter into a mitigation agreement. The school district and the <br /> Applicant have entered into a voluntary mitigation agreement. (Exhibits #1, #7) <br /> 20. Sewer and water are available to the site. The sewer and water will be <br /> connected to mains that are located in adjoining streets. (Witcher testimony) <br /> 21 . The proposed project will generate approximately 120 vehicular trips per day. <br /> This increase in traffic will impact streets, intersections, and road improvements <br /> in the general area. The Public Works Department determined that the total <br /> impact from the development of the site will result in impacts that can be <br /> mitigated with a $9,200 payment as part of street improvements in the area. <br /> Pursuant to the City's interim mitigation ordinance, the City is requiring the <br /> Applicant to pay a mitigation fee of $9,200. The Applicant will also be required <br /> to make half-street improvements on 2nd Avenue West where it fronts the <br /> subject property. The 2nd Avenue West improvements shall include curbs, <br /> gutters, and sidewalks. (Witcher testimony) <br /> 4 <br />