Laserfiche WebLink
1 , � '� <br /> and the landscaping required For Uic parking lot located south of tlte utility building will <br /> be required to be installecl prior to issuance of a certificate of occupancy for the utility <br /> Uuilding. <br /> The public is advised that based on intcrim uscs for the site approved in tlie Master Plan <br /> adopted by Ordinance No. 3090-08, the landscaping for the site in areas shown as open <br /> ficlds �vill not be completed cxacdy as shown on Cxl�ibit 2 until afler construction <br /> activitics for Qie hospital towcr and subsequent inten�al remodeling activities are <br /> complete. Section 2.8 of the ECC site Master Plan allo�vs for "tcmporary parking, <br /> construction staging, material storage as provided in Section 3.9 of this mastcr plan." <br /> Section 3.9 of the Master Plan provides tlie following: <br /> 39.1 Unlil its developmcnt for]tospital, clinic and medical-related activities, PEMC <br /> will utilize tl�e area designatcd for a height of 175 feet, an<t portions of thc 75 foot height <br /> zone as may be approvcd by the Planning Director, for temporary parking, construction <br /> staging and matcrials storage to support development of other areas of its campus. <br /> 3.9.2 As a condition of using the area describcd in subsection 39.1 aUovc for:zmparary <br /> parking, construciion staging and materials slorage, PEIviC will install landscaping of die <br /> Type rcquired Uy tlte Plaiming Director along the northern edge of 13'�' Street for the <br /> �vidth of'such area, and provi;lc tcmporary fcncing and othcr suitable landscaping around <br /> the western, northern and eastern bounclaries of sucl� area. The ptan for such landscaping <br /> will Ue reviewed by and must bc approved by the Planning Director. <br /> 39.3 Until its devclopment forhospital, clinic and mcdical-related activities, PEMC <br /> will utilizc the area designaled fon c�ights of 45 feet and 75 feet for surface parking, <br /> subject to the Design Guidelines for"Parking Lots" and thc reyuirements of EMC <br /> Chapter 19.35. <br /> 13ascd on the provisions of Section 2.3 anci 39 of tlte Master Plan, thc landscaping and <br /> pedestrian walk�vays in ExhiUit 2, othcr than tliat described in the first paragraph of this <br /> Section as required for occupancy of the utility building, is likely to be installcd in phases <br /> as construction staging, mate�ials storage, and temporary parking aciivities are completed <br /> and phascd out In dic event tliat Providence proposes other buildings or additional <br /> surface parking iacilities other than for temporary use during construction, a full public <br /> rcview of the proposcd buiidings or parking areas will bc conducted by the City as <br /> required by Section 4.1.1 of the Master Plan. <br /> 0 <br /> Approved by: � Datc: 3 ' 3O — �� <br /> I'lanning Dircctor <br /> l� <br />