My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1016 14TH ST 2016-01-01 MF Import
>
Address Records
>
14TH ST
>
1016
>
1016 14TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 12:10:54 PM
Creation date
4/4/2017 12:10:32 PM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1016
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> . PU�L/C Iq/O/�K,,�r c� <br /> , . <br /> py <br /> Nov.20, 1997 � <br /> John Mohr,Executive Directar <br /> Port of Everett <br /> 170Q West Marine View Dr.. <br /> Everett, Wash. 98201 ' <br /> Subj: Fishertnan's Boat Shop <br /> Deaz Mr. Mohr: <br /> The purpose of this letter is to confirm my voice mail message to yuu on November 20, 1997 regarding <br /> Fishertnan's Boat Shop. I received a letter from you dated November 10, 1997 stating that you <br /> recommended approval of Fisherman's Boat Shop proposal to discharge stormwater intu the Ciry's sewer <br /> system as long as the additional flows are seconda.ry to the Port's nee�s. <br /> I assume by this statement that you are referring to the City's previous approval of the discharge of 2.4 <br /> CFS of stormwater runoff from the Port Gardner Landing project. In fact, it was previously agreed by <br /> the Port of Everett, Fisherman's Boat Shop and the City of Everett (reference attached copy of July 7, <br /> 1997 letter from Reid Middleton) that the total discharge of stormwater runoff from the Port Gardner <br /> Landing project and Fisherman's Boat Shop would be limited to 2.4 CFS. This means thai the discharge <br /> from the Port Gardner Landing project must be decreased by whatever is discharged from Fisherman's <br /> Boat Shop. <br /> The current plan by Fishertnan's Boat Shop calls for a dischazge of up to 0.21 CFS oF stortnwater into <br /> the Ciry's sewer system. Therefore, as previously agreed,jhe discharge from the Port Gardner Landing <br /> project must be reduced to 2.19 CFS. <br /> I hope th��this misunderstanding does not cause a signif:�ant problem for the Port of Everett. If it does, <br /> I would be harpy to meet with a representative of the Port of Everett to discuss this further. Please feel <br /> free to call me at(425) 257-8855 if you havc Tny questions or if you would like to schedule a meeting. <br /> Si c rely, <br /> //%�L� _`�-� <br /> Dan Mathias, P.E. <br /> Utilities Engineer <br /> cc: Clair Olivers I <br /> 1MohrNov <br /> CITY OF EVERETT•3200 Cedar SLeet• Everett, WA 98201 •(206) 259-8800•Fax (206) 259-8882 '� <br />
The URL can be used to link to this page
Your browser does not support the video tag.