Laserfiche WebLink
Comprehensive Plan designation and vision, future development impacts would at a <br /> minimum be similar to Alternative 2. <br /> Note: The applicant is considering the inclusion of various alternatives for public and private <br /> amenities outside the proposed commercial and residential development areas. <br /> 2. Approvals needed for the proposed development: <br /> • Amendment to regulations, including appropriate zoning amendments and approval of a <br /> Planned Development Overlay Zone with Development Agreement <br /> • Local, state and federal permits <br /> • Potential future application for federal grants <br /> 3. Land and Shoreline Use/Housing/Aesthetics: <br /> • Consistency with the Comprehensive Plan and Shoreline Master Program element <br /> • Proposed Planned Development Overlay Zone and zoning standards <br /> • Population and employment projections <br /> • Proposed building heights and building design <br /> • Light and glare <br /> • Potential impacts to views from residential areas to the west <br /> 4. Parks and recreation facilities, including public access: <br /> • Public and private facilities and open spaces to be provided, including proposed bicycle <br /> and pedestrian trails and linkages to existing residential areas and transit facilities <br /> • Consistency with Shoreline Public Access Plan <br /> 5. Cultural and historical resources: <br /> • Cultural and archaeological resources <br /> 6. Transportation: <br /> • Site access for vehicles, pedestrians, bicycles, transit <br /> • Trip generation, potential impacts, and proposed mitigation measures <br /> • Parking, including parking during construction and parking for public access <br /> • Relationship to planned future improvements <br /> • Potential Riverfront to Harborfront connections <br /> 7. Public services: <br /> • Fire/EMS,police, schools, libraries <br /> 8. Utilities: <br /> • Electricity, natural gas, communications, sanitary sewer, water, refuse <br /> • Amount required, source and availability <br /> 9. Geology/Soils: <br /> • Soil stability and seismic(liquefaction) hazard area construction standards <br /> 7 <br />