Laserfiche WebLink
• Grading, including relationship of final grades to adjacent properties, wetlands, and the <br /> Snohomish River, and consistency with Consent Decree for the previous landfill site <br /> • Slope stability(riverbank armor, fill slopes) <br /> 10. Air Quality: <br /> • Emissions that will result from construction and use of the site, including vehicle traffic <br /> emissions <br /> 11. Surface Water, Groundwater, and Stormwater Treatment: <br /> • Impacts on the Snohomish River, Bigelow Creek, and on-site wetlands, and proposed <br /> mitigation, including enhancement and restoration actions. Phasing plan for the <br /> enhancement and restoration actions <br /> • Compliance with requirements in the City of Everett Shoreline Master Program for <br /> shoreline restoration and buffers <br /> • Impacts of possible over water construction <br /> • The Project's relationship to easements retained by BNSF for wetland mitigation related <br /> to the BNSF track relocation <br /> • Impacts on groundwater, including treatment of leachate from the landfill, and <br /> consistency with the Consent Decree <br /> • Stormwater treatment and detention <br /> • Flooding, including floodplain/floodway boundaries, compliance with floodplain <br /> regulations, and flood insurance requirements <br /> 12. Plants and Animals: <br /> • Plant and animal habitat, including fisheries habitat <br /> • Compliance with endangered species act, including analysis of threatened and <br /> endangered species consistent with a biological assessment <br /> • WDFW Priority Habitats recommendations <br /> • Significant Biological Areas of Local Importance(Simpson Category 1 wetlands) <br /> 13. Energy and Natural Resources: <br /> • Voluntary measures under the LEED Program <br /> • Amount required, source and availability <br /> 14. Environmental Health: <br /> • Environmental Health, and construction standards associated with the landfill <br /> • Noise, including construction noise; noise levels generated by adjacent and on-site land <br /> uses(including I-5, BNSF and retail loading areas), and compliance with City, state, and <br /> federal noise policies and regulations <br /> 15. Supplemental Issues—NEPA: <br /> • Environmental justice and other relevant impacts on the human/built environment <br /> Public Comment on EIS: The purpose of scoping is to determine the range of proposed <br /> actions, alternatives, and potentially significant environmental impacts to be discussed in the <br /> 8 <br />