My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/06/17 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/06/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 11:10:48 AM
Creation date
4/7/2017 11:09:08 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/17/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P� <br /> J <br /> intemet. Funds collected through this portal will be deposited in the City's public deposit account at U.S. <br /> Bank. The fees for these transactions are paid by the user through the application of a convenience fee. <br /> 4.5. Collections services. Upon expiration of the first citation,or,if applicable, upon expiration of the <br /> second citation , ATS will provide citation fine collection services for all final dispositions. Additionally, <br /> ATS.agrees to pursue collections,registration suspensions,or other legal and customary means <br /> necessary to compel payment of outstanding citations. ATS must conform to all requirements of the Fair <br /> Debt Collections Practice Act(FDCPA). <br /> 4.6 ATS will handle inbound and outbound phone calls and correspondence from defendants who have <br /> questions about issues relating to Notices of Violation, citation issuance,citation processing, payments, <br /> and AxsisTM technology/processes via websites and/or toll-free telephone numbers provided by ATS for <br /> that purpose. <br /> 5. CITY SCOPE OF WORK <br /> 5.1.General Implementation Requirements <br /> 5.1.1. Within 7 business days of contract execution,the City shall provide ATS with the name and contact <br /> information for a project manager with authority to coordinate City responsibilities under the Agreement. <br /> 5.1.2. Within 7 business days of contract execution,the City shall provide ATS with the name and contact <br /> information for an Everett Municipal Court manager responsible for oversight of all Court-related program <br /> requirements. <br /> 5.1.3. The City shall make every effort to adhere to the Project Time Line outlined in Schedule 3. <br /> 5.1.4. The City shall direct the Chief of Police or approved alternate execute the ATS DMV Subscriber <br /> Services Agreement(Schedule 2)to provide verification to the Washington State Department of <br /> Licensing, National Law Enforcement Telecommunications System,or appropriate authority indicating <br /> that ATS is acting as an Agent of the Customer for the purposes of accessing vehicle ownership data <br /> pursuant to the list of permissible uses delineated in the Drivers Privacy Protection Act 18 U.S.C. §2721, <br /> Section(b)(1)and as may otherwise be provided or required by any provision of applicable state law. <br /> 5.1.5. The City and ATS shall complete the Project Business Process Work Flow design within 30 <br /> calendar days of contract signature, using the outlines in Schedules 1 through 3 as the basis for the final <br /> workflow design. <br /> 5.2.Engineering and Public Services Department(Traffic Division) Operations <br /> 5.2.1. The City will design,fabricate,install and maintain red light camera warning signs. <br /> 5.2.2. The City shall provide access to traffic signal phase connections according to approved design. <br /> Only City Traffic Signal Technicians will perform wiring connections within the traffic signal cabinet to <br /> accomplish the red light camera installation. <br /> 5.2.3. The City may allow ATS to use existing street furniture, poles, and available conduit for the <br /> purposes of installing and operating its Camera Systems,according to approved design. A City Traffic <br /> Signal Technician must be present during installation for the Camera Systems on existing street furniture, <br /> poles and conduit at the intersections. <br /> 5.2.4. The City shall not require ATS to provide installation drawings stamped by a licensed civil engineer. <br /> However,ATS work product and drawings shall conform to professional norms and reflect the details of <br /> installation work to be completed. <br /> 5.2.5. The City shall approve or reject ATS's submitted plans within 7-10 business days of receipt. If after <br /> 10 business days,the City has not rejected ATS's plans,they will be deemed accepted. <br /> 5.2.6. The City shall process street use and pole attachment permit requests prepared by ATS in <br /> accordance with its established criteria. <br /> 5 <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.