Laserfiche WebLink
• There are no specific deliverables for this task. When EPWD requests assistance,the request <br /> may also include a deliverable. <br /> Assumptions: <br /> 1. EPWD request for construction support will not exceed the available funding(approximately 30 <br /> hours) included in the cost estimate. <br /> 2. EPWD will provide ICF with reasonable advance notice when requesting ICF to attend meetings <br /> or perform field observations on a specific day. <br /> New Task 19:Construction Year 2018 Dike Breach Construction Support <br /> ICF will provide construction support services to EPWD on an as requested basis. ICF will have the <br /> engineer of record for the project, as well as other key staff that participated in project design and <br /> permitting, available to assist EPWD throughout construction of the project during the 2018 calendar <br /> year. EPWD will identify when assistance would be useful and ICF will provide the requested assistance <br /> within a reasonable timeframe of notification. ICF will provide assistance up to the available funding for <br /> this task(30 labor hours for the lead engineer). Potential types of assistance provided include but are <br /> not limited to: attendance at preconstruction meeting, review Contractor submittals,observation of <br /> initial work for various work items,evaluation of unanticipated site conditions, assessment of the <br /> Contractor's compliance with permit requirements, and review of finished work to determine if it <br /> adequately meets the work as shown on the plans. <br /> Deliverables: <br /> • There are no specific deliverables for this task. When EPWD requests assistance,the request <br /> may also include a deliverable. <br /> Assumptions: <br /> 1. EPWD request for construction support will not exceed the available funding(approximately 30 <br /> hours) included in the cost estimate. <br /> 2. EPWD will provide ICF with reasonable advance notice when requesting ICE to attend meetings <br /> or perform field observations on a specific day. <br /> New Task 20:South Smith Island Support <br /> Per EPWD request of January 5, 2017, ICF will provide review and coordination support to EPWD for <br /> review of the November 4, 2016 Port of Everett/Hart Crowser summary memos regarding the feasibility <br /> of using South Smith Island for upland dredge material disposal in advance of WPCF expansion. ICF will <br /> review the memos and coordinate with EPWD on questions regarding anticipated mitigation ratios, <br /> SEWIP ratios,and permitting implications for EPWD. <br /> Deliverables: <br />