• <br /> • <br /> 3 <br /> monitor groundwater conditions. Traffic control services will be required to complete the explorations and <br /> it appears that coring of the existing pavement may also be necessary prior to drilling. Borings completed <br /> through existing pavement will be patched with concrete. <br /> 3.4 Measure groundwater levels in the site piezometers one time after drilling to monitor groundwater levels. <br /> 3.5 Complete laboratory testing on soil samples obtained from the subsurface explorations. Laboratory testing <br /> is expected to include moisture content determinations and grain size analyses. <br /> 3.6 Complete geotechnical analyses of the soil and groundwater conditions relative to design and construction <br /> considerations. <br /> ' 3.7 Prepare a geotechnical report summarizing the findings of the geotechnical investigation. The report will <br /> include: <br /> a. Site plan showing pertinent surface features and approximate exploration locations <br /> b. Descriptive logs of the explorations, including existing pavement thickness <br /> c. A summary of the site reconnaissance findings <br /> d. Results of the laboratory tests <br /> e. A discussion of the geotechnical feasibility of the project <br /> f. An evaluation of seismic induced liquefaction and estimated seismic settlements <br /> g. Recommendations for support of the new pipeline and manhole structures and estimates of probable <br /> post-construction settlements <br /> h. Structural till placement and compaction recommendations including a discussion regarding the <br /> feasibility of utilizing on-site soil as trench backfill <br /> i. A discussion regarding the potential for hydrostatic uplift pressures on subsurface structures and <br /> geotechnical design recommendations to resist uplift,as appropriate <br /> j. Recommendations for temporary open cut slopes and trench shoring <br /> k. An evaluation of dewatering considerations and estimated dewatering discharge rates,as appropriate. <br /> Our evaluation of dewatering discharge rates,if required by the site conditions,would be based on the <br /> results of the grain size analyses. <br /> Deliverables: Geotechnical Report(Prepared by Terracon) <br /> Task 4 Permitting Support <br /> The City of Everett will prepare and submit applications for all permits and approvals required for this project, <br /> which are anticipated to include an HPA from Washington Department of Fish and Wildlife, SEPA,and City of <br /> Everett construction permits. Allowances have been included for Consultant participation in permitting, <br /> anticipated to consist of providing input and data for the permit applications and attending meetings as requested. <br /> Task 5 Final Plans,Specifications,and Estimates <br /> This task includes preparation of final plans,specifications,and estimates(PS&E)for the project. Anticipated <br /> sub-tasks include: <br /> 5.1 Finalize upstream basin delineation and final pipe sizing calculations. Prepare technical memorandum <br /> documenting final calculations for the drainage improvements(submit at 90%,draft and final). <br /> Page3of7 21 <br />