Laserfiche WebLink
3 <br /> (including local street improvements and modifications to Evergreen Way as reviewed by <br /> City staff), streetscape, and public facility measures. Prepare plans and other visuals to <br /> illustrate the intended form and character. Meet with the Task Force to review and <br /> integrate components. <br /> d. Identify transportation facility needs to support redevelopment and City circulation and <br /> transit goals and policies. Explore implications of future transit systems. <br /> City Responsibilities <br /> • Review the work. <br /> Products <br /> • A corridor redevelopment scenario, with one or more development schemes, for each <br /> segment illustrating redevelopment opportunities, proposed types, public improvements, <br /> and general public actions necessary to support each segment. The scenario may <br /> include alternatives or questions for City policymakers and citizens to consider (e.g.: <br /> Should the City favor intense residential or commercial uses in a certain area? Should <br /> the City undertake substantial modifications to the Evergreen Way right-of-way?). <br /> • A comparative analysis of different scenario options. <br /> • Possible transportation actions and analysis of implications. <br /> • Visualizations of a preferred (or alternate) design character for specific segments, as <br /> appropriate. <br /> Schedule <br /> • Complete by June 30, 2010. <br /> 4. A Iternative/Scenario Review <br /> a. Prepare for and conduct a public open house/work session to evaluate scenario <br /> alternatives. <br /> b. Conduct a Developers Forum to review development scenarios and receive comments <br /> from the development community on the conditions and actions necessary to achieve <br /> the desired redevelopment. <br /> c. Meet with the Task Force to sketch a preferred concept. <br /> d. Brief the Planning Commission and/or Council and take direction. <br /> City Responsibilities <br /> • Arrange for the public open house. <br /> • Arrange space and time for the Developers Forum. (The consultant will identify forum <br /> panel members, with City assistance.) <br /> Products <br /> MAKERS architecture and urban design 14 Page 3 <br /> EXHIBIT a SCOPE OF WORK 10-20-09-10/20/09 <br />