My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4138
>
Resolutions
>
Resolution 4138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 11:09:19 AM
Creation date
4/11/2017 11:09:02 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4138
Date
7/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Six Year Transportation Improvement Program <br /> Instructions for Preparing the Form <br /> Include all projects regardless of location or source of funds.Complete the form for the six year program in accordance with the <br /> following instructions. <br /> Heading <br /> Agency Enter name of the sponsoring agency. <br /> County Number Enter the OFM assigned number.(See LAG Appendix 21.37.) <br /> City Number Enter the OFM assigned Number.(See LAG Appendix 21.38.) <br /> MPO Enter the name of the associated MPO(if located within urbanized area). <br /> Hearing Date Enter the date of public hearing. <br /> Adoption Date Enter the date this program was adopted by council or commission. <br /> Resolution Number Enter Legislative Authority resolution number if applicable. <br /> Column Number <br /> I. Functional Classification. Enter the appropriate two-digit code denoting the Federal Functional Classification. <br /> (Note:The Federal Functional Classification must be approved by FHWA.) <br /> Description <br /> Rural(under 5,000 area) Urban(over 5,000 areas) <br /> 01 Interstate I I Interstate <br /> 02 Principal Arterial 12 Freeways&Expressways <br /> 06 Minor Arterials 14 Other Principal Arterials <br /> 07 Major Collector 16 Minor Arterial <br /> 08 Minor Collector 17 Collector <br /> 09 Local Access 19 Local Access <br /> 00 No Classification 00 No Classification <br /> 2. Priority Number.Enter local agency number identifying agency project priority(optional). <br /> 3. Project Identification.Enter(a)Federal Aid Number if previously assigned;(b)Bridge Number,(e)Project title;(d)Street/Road Name <br /> or Number/Federal Route Number,(e)Beginning and Ending Termini(mile post or street names);and(f)Describe the Work to be <br /> Completed. <br /> 4. Improvement Type Codes. Enter the appropriate federal code number(s). <br /> Description <br /> 01 New construction on new alignment 12 Safety/Traffic Operatio/1 SM <br /> 02 Relocation 13 Environmentally Related <br /> 03 Reconstruction 14 Bridge Program Special <br /> 04 Major Widening 21 Transit Capital Project <br /> 05 Minor Widening 22 Transit Operational Project <br /> 06 Other Enhancements 23 Transit Planning <br /> 08 New Bridge Construction 24 Transit training/Administration • <br /> 09 Bridge Replacement 31 Non Capital Improvement. <br /> 10 Bridge Rehabilitation 32 Non Motor Vehicle Project <br /> 11 'Minor Bridge Rehabilitation <br /> 5. Funding Status. Enter the funding status for the entire project which describes the current status. <br /> F Project is selected and funding has been secured by the lead agency. <br /> S Project is subject to selection by an agency other than the lead. <br /> P Project is listed for planning purpose and funding is not secured. <br /> 6. Total Length. Enter project length to the nearest hundredth miles(or code"00"if not applicable). <br /> 7. Utility Code(s). Enter the appropriate code letter(s)for the utilities that would need to be relocated or are impacted by the construction <br /> project. <br /> C Cable TV S Sewer(other than agency owned) G Gus <br /> P Power T Telephone W Water <br /> 0 Other <br /> 8. Protect Phase. Select the appropriate phase code of the project. <br /> PE Preliminary Engineering only(or planning) <br /> RW Right of Way or land acquisition only(or equipment purchase) <br /> CN Construction only(or transit operating) <br /> ALL All Phases from Preliminary Engineering through Construction <br /> 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually excepted to sten. <br /> 10. Federal Funds Source. Enter the Federal Fund Source code from the table. <br /> BR Bridge Replacement or Rehab. S9 FTA Urban Areas <br /> CMAQ Congestion Mitigation Air Quality STP(C) STP Statewide Competitive Program <br /> DEMO ISTEA Demo Projects(Selected) STP(E) STP Transportation Enhancements <br /> IC Interstate Construction STP(S) STP Safety including Hazard&RR <br /> IM Interstate Maintenance STP(R) STP Rural regionally selected <br /> NHS National Highway System STP(U) Si?Urban regionally selected <br /> S16 FTA Elderly&Disabled Persons STP STP all other STP project not listed <br /> S18 PTA Rural Areas Other All other Federal Funds Sources <br /> S3 PTA Discretionary for Capital Expenditure <br /> 11. Federal Cost. Enter the total federal cost(its thousands)of the phase regardless of when the funds will be spent. <br /> 12. State Funds Code. Enter appropriate for any of the listed funds to be used on this project. <br /> CAPP County Arterial Preservation Program RAP Rural Arterial Program <br /> TIA Transrnnslicn Impmvrmtsl Arcrsmt (IATA Urban Arterial Trust Account <br /> PWTF Public Works Trust Fund Other i.e.WSDOT <br /> 13. State Funds. Enter all funds from Stats Agencies(in thousands)of the phase regardless of when the funds will be spent. <br /> 14. Local Funds. Enter all funds from local Agencies(in thousands)of the phase regardless of when the funds will be spent. <br /> 15. Total Funds. Enter the Sum of columns 10,12,and 14. <br /> 16.19. Expenditure Schedule-(1st.2nd,3rd,4th thru 6th years). Enter the estimated expenditures(in thousands)of dollars by year.This <br /> data is for Local Agency use. <br /> 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project.This is required foe <br /> Federally Funded projects only. <br /> EIS Environmental Impact Statement CE Categorical Exclusion <br /> EA Environmental Assessment NA Not Applicable/Unknown <br /> 21. R/W Cerlifleation.Circle Y if Right of Way acquisition is required.If yes,Enter R/W Certification Date if known.This is required for <br /> Federally Funded projects only. <br /> DOT Form 140.0.19 Instructions <br /> Revised 4/91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.