My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> E. Information relevant to Bidding Documents will be issued by Addenda. <br /> 1.11 INQUIRIES AND ADDENDA <br /> A. Should a Bidder find what is believed to be discrepancies in or omissions from the Drawings or <br /> Specifications, or should the Bidder be in doubt as to their meaning, Bidder may submit to the <br /> City an emailed or faxed written request for an interpretation. <br /> B. Direct questions in writing to Richard Hefti, PE, at 3200 Cedar Street, Everett, WA 98201, <br /> facsimile(425)257-8882 or e-mail to rhefti@everettwa.gov. <br /> C. Verbal answers are not binding on any party. <br /> D. Submit questions not less than seven days before date set for receipt of Bids. <br /> E. Addenda: <br /> 1. Replies will be made by Addenda,which may be issued during Bidding period. <br /> 2. Addenda will be published online on Washington Builders Exchange website. <br /> 3. Addenda become part of Contract Documents. <br /> F. Include resultant costs in Bid Sum. <br /> 1.12 PRODUCT SUBSTITUTIONS <br /> A. Requests for product substitutions will not be accepted before execution of Contract; refer to <br /> Section 012513 -Product Substitution Procedures. <br /> B. Changes in the Work: <br /> 1. In submitting substitutions to specified products, Bidders shall include changes required <br /> in the Work and changes to Contract Time, Contract Sum, and to accommodate such <br /> approved substitutions in their Bid. <br /> 2. Later claims by the Bidder for an addition to the Contract Time or Contract Sum because <br /> of changes in Work necessitated by use of substitutions will not be considered. <br /> C. Approval to submit substitution requests prior to submission of Bids is not required. <br /> 1.13 SUBMISSION PROCEDURE <br /> A. Bidders shall be solely responsible for delivery of Bids in manner and time prescribed. <br /> B. Submit one copy of executed offer on provided Bid Forms found in the Contract Documents, <br /> signed and sealed with required security deposit in a closed opaque envelope, and clearly <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 002113 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.