Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> 3.3 PERSONNEL PARKING <br /> A. Construction personnel shall park personal vehicles in areas as shown on the Contract <br /> Drawings (Drawing No. G-001) or as directed by the Owner at the preconstruction meeting. <br /> 3.4 UTILITIES LEAD TIME AND SHUTDOWN <br /> A. The Contractor shall contact the Owner prior to interruption of utilities and shall limit utilities <br /> shutdown duration, in accordance with sheet G-002 of the Contract Drawings. <br /> END OF SECTION 011400 <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 011400 -2 <br />