My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> SECTION 013200—CONSTRUCTION PROGRESS DOCUMENTATION <br /> PART 1 -GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and other Division 01 Specification Sections, apply to this Section. <br /> 1.2 SUMMARY <br /> A. Section includes administrative and procedural requirements for documenting the progress of <br /> construction during performance of the Work, including the following: <br /> 1. Start-up construction schedule. <br /> 2. Contractor's construction schedule. <br /> 3. Submittals schedule. <br /> 4. Daily construction reports. <br /> 5. Material location reports. <br /> 6. Field condition reports. <br /> 7. Special reports. <br /> B. Related Sections: <br /> 1. Section 01 33 00—Submittal Procedures for submitting schedules and reports. <br /> 1.3 DEFINITIONS <br /> A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, <br /> and controlling the construction project. Activities included in a construction schedule consume <br /> time and resources. <br /> 1. Critical Activity: An activity on the critical path that must start and finish on the planned <br /> early start and finish times. <br /> 2. Predecessor Activity: An activity that precedes another activity in the network. <br /> 3. Successor Activity: An activity that follows another activity in the network. <br /> B. Cost Loading: The allocation of the schedule of values for the completion of an activity as <br /> scheduled. The sum of costs for all activities must equal the total Contract Sum, unless <br /> otherwise approved by the Owner. <br /> C. Critical Path Method (CPM): CPM, which is a method of planning and scheduling a <br /> construction project where activities are arranged based on activity relationships. Network <br /> calculations determine when activities can be performed and the critical path of the Project. <br /> D. Critical Path: The longest connected chain of interdependent activities through the network <br /> schedule that establishes the minimum overall Project duration and contains no float. <br /> E. Event: The starting or ending point of an activity. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 013200 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.