Laserfiche WebLink
BID TABULATION <br /> Lift Station 5 Force Main <br /> W.O.#UP -040g <br /> Date 12/9/2009 <br /> Prepared By:William Barrett <br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE Mosbrucker Construction ICI Construction Strider Construction Thomco Construction <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> I ITEM DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT_ PRICE AMOUNT <br /> 1 Mobilization LS 1 $40,000.00 $40,000.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 $36,000.00 $36,000.00 $24,000.00 $24,000.00 <br /> 2 Traffic Control Labor Hours 100 $75.00 $7,500.00 $55.00 $5,500.00 $41.00 $4,100.00 $70.00 37,000.00 $50.00 $5,000.00 <br /> 3 Maintenance&Protection of LS 1 $7,500.00 $7,500.00 $4,000.00 $4,000.00 $1,000.00 $1,000.00 $400.00 $400.00 $6,654.50 $6,654.50 <br /> Traffic Control <br /> 4 Sawcutting Pavement,Final Joint LF 400 $5.00 $2,000.00 $3.00 $1,200.00 $5.00 $2,000.00 $1.50 $600.00 $2.12 $848.00 <br /> Cut,Up to6-Inch Thickness <br /> 5 Sawcutting Pavement,Final Joint LF 400 $0.75 $300.00 $10.00 $4,000.00 $1.00 $400.00 $0.50 $200.00 $2.12 $848.00 <br /> Cut,Additional 1-Inch Thickness <br /> 6 Street Cleaning and Sweeping LS 1 $3,000.00 $3,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $600.00 $600.00 $2,500.00 $2,500.00 <br /> 7 Control Density Fill CY 100 $150.00 $15,000.00 $100.00 $10,000.00 $125.00 $12,500.00 $80.00 $8,000.00 $125.00 $12,500.00 <br /> 8 HMA Class 1/2"PG 64-22 Ton 30 $150.00 $4,500.00 $150.00 $4,500.00 $155.00 $4,650.00 $118.00 $3,540.00 $150.00 . $4,500.00 <br /> 9 Asphalt Treated Base Ton 60 $120.00 $7,200.00 $150.00 $9,000.00 $155.00 $9,300.00 $118.00 $7,080.00 $150.00 $9,000.00 <br /> 10 Pavement Patch,Temporary Ton 100 $200.00 $20,000.00 $150.00 $15,000.00 $142.00 $14,200.00 $118.00 $11,800.00 .$100.00 $10,000.00 <br /> GD <br /> 1D Trench Excavation Safety System LS 1 $20,000.00 $20,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $900.00 $900.00 $2,856.00 $2,856.00 <br /> 12 Surveying LS I $5,000.00 $5,000.00 $1,700.00 $1,700.00 $2,000.00 $2,000.00 $1,600.00 $1,600.00 $1,220.00 $1,220.00 <br /> 13 Utility Potholing 1.5 1 $20,000.00 $20,000.00 $4,000.00 $4,000.00 $3,000.00 $3,000.00 $1,000.00 $1,000.00 $5,712.00 $5,712.00 <br /> 14 Combined Sewer Force Main,8- LF 450 $250.00 $112,500.00 $90.00 $40,500.00 $68.00 $30,600.00 $125.00 $56,250.00 $119.29 $53,680.50 <br /> Inch Diameter <br /> 15 8-Inch Flexible Expansion Joint IS 1 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $7,400.00 $7,400.00 $4,200.00 $4,200.00 $6,907.69 $6,907.69 <br /> ' 16 Lift Station 5 Valves and Piping LS 1 $50,000.00 $50,000.00 $45,000.00 $45,000.00 $47,200.00 $47,200.00 $40,000.00 $40,000.00 $40,191.17 $40,191.17 <br /> 17 Pipe Supports LS 1 $10,000.00 $10,000.00 $22,500.00 $22,500.00 $20,150.00 $20,150.00 $20,000.00 $20,000.00 $18,750.00 $18,750.00 <br /> 18 Pipe Insulation LS 1 $7,500.00 $7,500.00 $12,000.00 $12,000.00 $8,645.00 $8,645.00 $8,000.00 $8,000.00 $6,928.86 $6,928.86 <br /> F,r ' <br />